Council archive · source document
Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed · MCU25/0020
Plans and drawings: the text below has words only, no drawings.
KEY: DA APPROVED DWELLING - RAP17/0012.02 - 25/05/2021 PROPOSED AND APPROVED WEST ELEVATION PROPOSED AND APPROVED EAST ELEVATION SCALE: 1: 150 SCALE: 1: 150 BASEMENT 3 2000 PROPOSED AND APPROVED SOUTH ELEVATION SCALE: 1: 150 PROPOSED AND APPROVED NORTH ELEVATION SCALE: 1: 150 : . CLIENT NAME: Sunshine Beach Noosa Developments Pty Ltd. PROJECT NAME:River Oasis www.chriscloutdesign.com.au GENERAL NOTES: Use written dimensions only. DO NOT scale drawings. Contractors to verify all SITE ADDRESS: 11 RAVENWOOD DRIVE, NOOSA HEADS QLD 4567 — A ee Eee ie REET dimensions on site prior to commencing works. Site location in accordance with CHRISC LOUTODESION SUNSHINE BEACH, OLD 4667 erajncors dais, These drawings are be read in conjunction wih engineers design DRAWING TITLEPROPOSED AND APPROVED ELEVATIONS E: [email protected] and details, the accompanying building specification and schedule of finishes. If in doubt, DRAWING DATE03/10/25 SCALE:1: 150 @A3 DRAWN BY:C.CLOUT C53 P: (07) 54748 107 BSALICENCE: 1127508 lease request clarification. DO NOT ASSUME. . please reqi issue:DA ISSUE C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.