Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed · MCU25/0020

of 54

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
ADG Consulting Pty Ltd

 

The Act requires that appropriate action be taken to report that environmental harm is occurring or has
the potential to occur, unless the harm is authorised under an environmental protection policy, an
environmental management program, a development approval, or an environmental protection order.
This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.

1.4 DMP objectives

The objectives of the DMP are to:

— Describe the dewatering methodology, groundwater treatment, monitoring and reporting
procedures to be employed at the site during dewatering activities.

— Provide effective management procedures to prevent environmental harm resulting from the
discharge of extracted groundwater from the site.

1.5 Scope of work

To achieve the investigation objectives, the following scope of work was undertaken:

—  Adesktop study including:

1.
2.
3.

4.
5.

Review of the development proposal and proposed shoring/dewatering designs.

Review of geology and soil maps for the area.

Search of groundwater bores licensed by the Department of Local Government, Water and
Volunteers (DLGWV) within a 200 m radius of the site.

Review of relevant existing reports and groundwater data from the local area.

Review of current aerial photographs of the site and surrounds.

— The preparation of this Dewatering Management Plan for submission to Noose Shire Council (NSC).

 

ADG1786.25 Dewatering Management Plan_Rev1_07.10.25 Page 2

Used in these records

About this file

File size
5.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to outstanding issues - ADG1786.25 Dewatering Management Plan_Rev1_07.10.25-compressed.pdf · 5.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.