20170025 - Amended Drawings - Received 23-04-2017 · MCU17/0038
Attached to the e-mail Development Application MCU17/0038.
A2
A211
two-storey
structure beyond operable perforated
metal roller shutter
screens
Colorbond corrugated
metal roofing &
cladding 'Surfmist’
solar panels
LOT 676
EXISTING
TWO-STOREY
7
a HOUSE
SS
projection beyond
refer section C1
LOT 698 . ~ projection Ai
SP 227987 » beyond
glass
balustrade
terrace
lower-deck. FFL_25.65.
existing
boundary
of existing paling
RL 25.169
NN
existing 1.5m paling
fence to seaward
boundary (Lot 698) >|
approximate existing block proposed 1.2m metal picket low landscape concrete block s
existing ground retaining wall fence over existing retaining terrace wall foundation wall 2 | existing timber
line at boundary on boundary wall. approx 80% open. black By picket fence ‘existing landscape retaining
powdercoat finish | walls and stairs in yard to
Lot 676. refer survey plan
and aerial photographs
| 11 THE ESPLANADE SUNSHINE BEACH (SUBJECT PROPERTY)
A A
SCALE 1:100
ABBREVIATIONS: MATERIALS & FINISHES Julian Patterson - Registered Architect
BOAQ 4341 / ABN 22160669013
COL COLUMN CB1 COLORBOND ROOFING, CLADDING, FLASHING, PF# PAINT FINISH — REFER PAINT SCHEDULE 381 Sydney Road Brunswick 3056
REFER TO COVER PAGE A000 FOR DP DOWNPIPE CAPPING AND RAINWATER GOODS ‘SURFMIST’ PV1 PAVING AS SPECIFIED [email protected]
ANY GENERAL NOTES APPLICABLE TO FCL FINISHED CEILING LEVEL CB2 COLORBOND ROOFING, PROFILE TYPE 2 AS 1B1 TIMBER BATTEN SCREEN — NATURAL/CLEAR 0403 593 019
THIS AND ALL ARCHITECTURAL FFL FINISHED FLOOR LEVEL SPECIFIED, ’SURFMIST’ FINISH
ie aor WALT LEVEL CO1 CONCRETE SLAB TROWEL FINISH (GARAGE) TB2 EXTERIOR TIMBERS — NATURAL/CLEAR SEAL project
C02 EXTERIOR CONCRETE PAVING TCL TIMBER CEILING / SOFFIT LINING NEW HOUSE AT 11 THE ESPLANADE
RL RELATIVE LEVEL
CF1 CONCRETE FLOOR SLAB, HONED FINISH, TC1 TIMBER CLADDING CLEAR/NATURAL FINISH (LOT 675) SUNSHINE BEACH
SHR SHOWER CLEAR PENETRATING SEAL
TS TOILET SUITE TC2 TIMBER CLADDING PAINT FINISH
VB VANITY BASIN CM1_ FACE CONCRETE MASONRY UNFINISHED D1 TIMBER DECKING CLEAR SEAL drawing title
FC1 FIBRE CEMENT CLADDING/LINING; PAINT TF1 TIMBER FLOORING AS SPECIFIED PROPOSED EAST ELEVATION
WM — WASHING MACHINE
FINISH TL1 FLOOR TILES (WET AREAS)
GL1 CLEAR GLAZING (DOORS & WINDOWS) TL2 WALL TILES (WET AREAS) - - ——
Gat) MATERIAL CODE GL2 OBSCURE GLAZING (DOORS é& WINDOWS) TL3. FLOOR TILES (LIVING AREAS) date: dwg no: revision:
GL3_ GLASS BALUSTRADE WB1 WEATHERBOARD CLADDING PAINT FINISH 0 tm am m) 2 t:94.2017 TP
scale: stage: TOWN PLANNING
1:100@A3 APPLICATION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20170025 - Amended Drawings - Received 23-04-2017.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.