Original source · versioned page text
Planning Report
PO9 Development does not No acceptable outcome provided N/A
result in environmental
harm or environmental
nuisance to sensitive
land uses.
PO10 Development does not A010 Safe vehicular access is provided to N/A
compromise the safety, and form the site without adversely
capacity or operation of impacting on the safety of the road
the road network. network.
Performance outcomes Acceptable Outcomes
Environment, heritage and scenic amenity
PO11 Development does not AO11.1 Development does not result in N/A
have a significant sediment, soil or other material
adverse impact on the including building materials or
waste products being released
natural values of the
into the road reserve, stormwater
site including through: drains, waterways or adjacent
(a) loss of biodiversity properties.
values, fauna
habitat and fish
passage;
(b) changes to natural
drainage;
(c) disturbance to any
wetland systems;
(d) erosion and the
transport of
sediments off
site (including
pollutants and
other
contaminants
which would
affect the
capacity of
agricultural
lands);
(e) worsening of
landslide or fire
risk;
(f) on-site effluent
disposal;
(g) creation of dust and
air pollutants;
(h) disturbance of
buildings and
features, including
natural features, of
cultural heritage
significance.
15 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.