Original source · versioned page text
DA Form 1
No Division 2 — Reconfiguring a lot Note: This division is ai ee tobe ee if. i a: of the ie ae involves sz a iot. Subdivision (complete 10)) Dividing land into parts by agreement (complete 11)) Boundary realignment (complete 12)) Creating or changing an easement giving access to a lot froma constructed road (complete 13)) Intended use of lots created Residential Commerciallndustriather, please specify: Number of lots created Yes — provide additional details below No How many stages will the works include? What stage(s) will this development application apply to? Intended use of parts created Residential Commercial Industrial Other, please specify: Number of parts created Current lot Proposed lot Lot on plan description Area (m?) — Lot on plan description Area (m?) Existing or Width (m) Length (m)Purpose of the easement? (e.g. pedestrian Identify the land/lot(s) proposed? access) benefitted by the easement Division 3 - Operational work Note: This division is a ae tobe BT if. Be % of the as ae involves we work, Road work Stormwater Water infrastructure Drainage work Earthworks Sewage infrastructure Landscaping Signage Clearing vegetation XY Other — please specify: ¢ Lo SSO ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.