Original source · versioned page text
2020-03-16 GC Agenda - Item 4 - Attachment 1 - MCU18 0015 Officers Report and attachments from 2019-06-11 P&E Agenda
The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 JUNE 2019
Traffic Engineering Advice:
“I understand the issue pertains to concern about the additional volumes of traffic in Attunga
Heights as a result of the 13 dwellings associated with the proposal.
Attunga Heights is a residential street with a pavement width of 6.0-6.5m. The normal
traffic related threshold for the residential catchment of such a street would be 75 dwellings.
There appear to be about 25 existing lots along the street, a few of which contain small
scale multiple dwellings, so the existing catchment of the street might be up to 40 dwellings.
With the 13 dwellings of the proposal added, the total number of dwellings served by
Attunga Heights would be up to say 55 dwellings, which is less than the normal 75 dwelling
threshold.
So while there will be additional traffic as a result of the proposal, it would be acceptable
according to normal limits for such a street.”
The report and advice received is incorporated into the assessment of this application.
The following provides a more detailed assessment against the specific provisions within the:
Strategic Framework
Desired Environmental Outcomes
Noosa Head Locality Code
Biodiversity and Natural Hazards Overlay Codes; and
Reconfiguring a Lot Code.
Strategic Framework
Section 1.7.12 Natural Environment Protection identifies the vision for the natural environment to
be protected:
“a) Through the use of zones and overlays the scheme identifies and seeks to protect areas of
remnant vegetation and encourages the rehabilitation of riparian corridors and wildlife
corridors. It also seeks to protect land of ecological, biophysical, scenic or cultural value,
including the mountains that dominate the landform and landscape.
b) Activities that have potential to impact on water quality, bank or slope stability, fauna habitats
and linkages, or significant scenic vistas are inconsistent within the scheme.”
Section 1.7.14 Natural Hazard Management identifies the vision for the natural hazards to be
managed:
“a) The planning scheme identifies areas at risk from natural hazards including landslide,
bushfire, flooding and acid sulfate soils.
b) Development in areas at risk from natural hazards is to be compatible with the nature of the
hazard so as not to place people, property, economic activity, social wellbeing and the
natural environment at risk.
c) Development is avoided in areas subject to natural hazards or where natural hazards cannot
be avoided, mitigation or adaptation measures are adopted taking into account predicted
frequency and severity of the natural hazard.
Development does not materially increase the impact or severity of natural hazards.”
Page 78 of 133
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.