Original source · versioned page text
2020-03-16 GC Agenda - Item 4 - Attachment 1 - MCU18 0015 Officers Report and attachments from 2019-06-11 P&E Agenda
The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
60.0 55.0
For MCU application
NOT FOR CONSTRUCTION
18.11.18
boundary
boundary
boundary
55.0 50.0
Balustrade / trellis climber screen
closed gaps within balustrade zone
(FGL+1000) house
9
house
50.0 45.0
6
existing existing
Existing walkway walkway
timber
boundary
fence
45.0 temporary sheet piling 40.0
retaining wall
concrete sleepers
1:10 pitch
existing filled filled suspended
40.0 footpath new sealed suspended 35.0 new sealed timber
easement landscaping driveway timber framing landscaping driveway framing
section D section G
section through existing walkway 1:100 section through existing walkway 1:100
0 1 2 3 5m
30.0
Scale 1 : 100 @ A3
Project Drawing Proj no.
N
O
4P
B56H
oQd0.73osaxealds ABN 85 114 469 395
5P40857h8 Reg No 002195
Multi residential development Sections through existing pathway 1830
540F8571a8x 27 Attunga Heights, Noosa Heads
scale date Dwg no.
Email [email protected] Client
Novato Group 1:100-A3 november '18 DD 11 - A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.