Original source · versioned page text
2020-03-16 GC Agenda - Item 4 - Attachment 1 - MCU18 0015 Officers Report and attachments from 2019-06-11 P&E Agenda
The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
25 40 45
15 20 25 30 35
59,000 78,000 60,000 40,000 43,972
50
20,000
10
Proposed Lot 4 Proposed Lot 3 Proposed Lot 2
28,000
28,000
1,589 m 2
1,200 m2 1,232 m2
Dedicated Open Space 60
10 55
6,510 m2 43,982
access
15 EMT
Proposed Lot 1
(Townhouses) 60
20 7,507 m 2
Total Developed Area = 5,665 m2 (31.4%)
25 30
N
I NNO V A T IV E Proposed Residential D e v e l o p m e n t - 27 Attunga Heights, N o o s a , Q L D
P L A NNING
P r o p o s e d Lot Reconfiguration Plan
S O L UT IO NS
www.townplanningsunshinecoast.com.au 1:1000 @ A 3 / 30 March 2016 / PL.02 (D)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.