Skip to the record
Accept no imitations.

Council archive · source document

Development Application - Part 2 of 2 - Report & Plans · OPW11/0116

of 79

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
     6.8 Social

Any complaints are to be investigated and responded to in a prompt manner. The Superintendent is to be notified of any
complaints as soon as practicable. A suitable complaint register is to be kept.


     6.9 Flammable and Combustible Materials

A list of all flammable and combustible materials, chemicals or any other potentially hazardous substances is to be noted on
the MSDS register.


     6.10 Greenhouse Gas Emissions

All machinery is to be regularly maintained and operated in accordance with specifications to minimise possible greenhouse
gas emissions.


     7.   ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS

Monitoring requirements are to be as below, in addition to any ERA Licence requirements.

Issue                   _ Monitoring                Frequency/Timing         Performance Criteria      Responsibility
Water Quality             Visual Inspection         Daily during dredging    No visible turbidity      Contractor
                                                    hours                    plume from dredging
                                                                             >200m from the
                                                                             dredge site.

                                                                             No visible al, grease,
                                                                             floating scum or litter
Noise                    Aural inspection of        Weekly during            Noise levels in           Contractor
                         equipment for              dredging                 accordance with
                         excessive noise.                                    equipment
                                                                             specification.

                         Investigation of noise     As required in           Complaints responded      Contractor
                         complaints                 response to any noise    to within 24 hours
                                                    complaints
Air Quality              Visual inspection for      Daily during dredging    No excess machinery       Contractor
                         excess machinery           hours                    exhaust
                         exhaust emissions
Waste Management         Visual inspection of       Daily during dredging    No uncontained litter     Contractor
                         site for floating debris   hours                    waste
                         for barge/dredge


     8.   CONTINGENCY PLANS & EMERGENCY PROCEDURES

Should any non-confirming results be observed or recorded, works are to suspended immediately and the Superintendent is
to be notified. A procedure for non-conformance is prepared for each Project. This procedure incorporates:

          •     Work Instructions issued
          •     Non Conformance Report Form
          •     Reporting Procedure
          •     Corrective Action

A number of specific detailed contingency plans are to be prepared and include an oil spill management plan and a waste
management plan.

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.