Council archive · source document
Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
International
Coastal ^pner recd cot la
Management
TABLE OF CONTENTS
EXECUTIVE SUMMARY ...........................................................................................................................................................1
1. BACKGROUND ................................................................................................................................................................ 3
2. EXISTING SITUATION ..................................................................................................................................................... 5
3. OPTION ASSESSMENT ................................................................................................................................................... 9
3.1. Option A - Do Nothing 9
3.2. Option B - Establish Erosion Limit Control Lines 13
3.3. Option C1 - Wall and Embayed Beach 14
3.4. Option C2 - Groyne Field and Embayed Beach 17
3.5. Option D1 - Submerged Upstream Closure 20
3.6. Option D2 - Submerged Upstream & Downstream Closure 23
3.7. Option D3 - Training Wall with Submerged Upstream & Downstream Closure 26
3.8. Option E - Combination 29
4. RECOMMENDED OPTION ............................................................................................................................................. 33
4.1. Risk Assessment 33
4.1.1. Uncertainty 33
4.1.2. Variability in shoreline response 34
4.1.3. Channel Evolution/ River Processes 34
4.1.4. Impact on Shoals 34
4.1.5. Erosion of Mangroves 34
4.1.6. Flooding 35
4.1.7. Flushing 35
4.1.8. Swimmer safety near submerged closure 35
4.1.9. Navigation 35
4.1.10. Vandalism I Vessel impact with the structure 35
4.1.11. Structural aspects 35
5. CONSTRUCTION MATERIALS ...................................................................................................................................... 36
5.1. Sand-filled geotextile containers 36
5.2. Rock 36
5.3. Comparison 36
6. PRELIMINARY DESIGN & COSTING ............................................................................................................................37
6.1. Submerged "Closure" 37
6.2. Training Wall 38
6.3. Revetment Wall 41
6.4. Groynes 42
6.5. Total Strategy 43
6.6. Staged Works 44
International Coastal Management r . (ICM)
v.a 5:) : Arm 5YC Mama Run Beam 0n 4111 Ajstraia
P3 3cr 3C€ Mxi Bea-1i 1 O Man Bea(', 0'o G; 1; Aubtaia
"u - 61 75ih40564 .y .61 7 5532 9147
.w.s www c oastalmananemertcom au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.