Skip to the record
Search everything, all in one place.

Council archive · source document

Development Application - Part 2 of 2 - Report & Plans · OPW11/0116

of 79

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Overlay of the 2009 survey with the 2002 aerial photo [Figure 10] confirmed that there has been substantial erosion along
the full length of the Noosa River Spit and also highlighted that there had also been substantial erosion of the end of the
Noosa River Spit. To gauge erosion rates without the impact of the artificial sand bunds, the 2009 survey was overlaid with
the 2006 aerial photo [Figure 111. Erosion is highest at the end of the Noosa River Spit [-15mlyr) and variable along the
length of the Noosa River Spit [up to 10m/yr adjacent to the rock wall].




Figure 10: Overlay of Sept 2009 survey on 2002 aerial photo showing erosion over 7 years




  45m eroS
Figure 11: Overlay of Sept 2009 survey on August 2006 aerial photo showing erosion over 3 years

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.