Council archive · source document
Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
rt-, ,teed Im/si
e 150
-150
C-100
-C-080
6" 070
D50-060
D40-050
035-040
D30-035
0' -030
'G-025
015-020
10.015
305.010
300-0U5
B-InN 000
l!rdetmed Value
in r-r» speed [m/s)
150
:, - 1 50
C-100
70.080
C-070
060
4C-050
3335-040
330-035
3:5.030
2C-025
1`-020
i C-015
-010
-005
F--I-LH 0 00
IirJetmed Vatui
Figure 24: Results of MIKE21HD model [ebb & flood tide] for Option C2 [Groyne Field]
[OCR of page images]
1
Current speed [m/s]
Above 1.50
Undefined Value
7
Current speed [m/s]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.