3.5. Option D1 - Submerged Upstream Closure Option D1 includes a submerged closure of the southern channel at the upstream end only [Figure 26]. While previous campaigns have focused on the formation of these closures using loose sand, the rapid erosion and the environmental impacts of ongoing dredging make this undesirable and a structural closure is being considered in this case, which also allows an equivalent height to be achieved with a substantially smaller footprint. The submerged closure is set at a height of -0.6m AHD [approximately low tide] such that the structure will be fully submerged the majority of the time and partially emergent only on the lowest of tides. Figure 26: Sketch of works forming Option D1 Numerical modeling [Figure 27 and Figure 28] showed that on the ebb tide, the upstream closure resulted in little change to velocities in general. Although some areas (including some high 'spots' of velocity) were significantly reduced, these were generally not in the 'problem' areas. The velocities on the flood tide were very similar to the existing situation with high velocities adjacent to the shore persisting [if not increased] in upstream areas. It may be that the potential impact of the upstream submerged closure is being masked by the fact that the southern channel is currently partially closed in this location, such that the change to the seabed in this location is not as pronounced as it may have been in the past. In the main channel, velocities were generally the same on the flood and ebb tides, although the areas of high velocity adjacent to the shoals were increased in size on both the ebb and flood tides. Velocities adjacent to the shore at the end of the Noosa River Spit were increased on the vulnerable ebb tide. Velocities over the closure peaked at >lm/s on the flood tide and 0.75m/s on the ebb tide. The area of increased velocity is limited to the footprint of the structure itself. In the medium term, while it is possible that the closure will reinforce the middle channel, it is likely that the channel will attempt to migrate to the south as it has in the past. This would result in the channel closure becoming a submerged groyne type feature. Since velocities have not been substantially reduced by the structure as a closure, it is unlikely that it would perform substantially better as a submerged groyne and it is likely that erosion issues will not be fully resolved, although they may be mitigated if the structure performs better under increased flows associated with a dominant southern channel. The structure could be extended [either initially or as required after breaching] to reinstate the closure. It appears that provision of a single submerged upstream closure would be of limited benefit in the short term and unknown benefit in the medium term. It seems likely that either a secondary closure would need to be introduced downstream [as done previously using artificial sand bunds, see Option D2] or the height of the structure will need to be raised in order to have a greater impact on velocities and erosion.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.