Velocities at the end of the training wall were up to lm/s on the flood tide at the end of the training wall, but are close to
existing velocities (-0.5m/s) on the ebb tide. The curved "closure" typically experiences relatively low velocities (<0.25 -
0.4m/s) on both the ebb and flood tides along its full length, although does show elevated velocities (up to lm/s) at the
downstream end on spring ebb tides.
r-fl• wee, i
t..eI
t^ 15o
100
060
').070
G-0.080
tttt^ . o - 0 so
,s-040
u•035
ttl♦ 030
0 25
020
-015
0 10
x•005
..000
w fined VoIu1
"ed (nvsJ
e 1 SG
:.15C
-tOC
OK
0%C
- J - 0 6C
4'-05C
5.040
30.035
_5.030
(tl♦ :0.025
15-020
ttl♦ - 0 15
- .•S 010
00:
E•a,,.000
1rhn.d Val
Figure 36: Results of MIKE21HD model [ebb & flood tide] for Option E [combination]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.