Skip to the record
The only place to find full transcripts.

Council archive · source document

Development Application - Part 2 of 2 - Report & Plans · OPW11/0116

of 79

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
In the medium term, it could be expected that the river will meander to the south as it has in the past. The training wall and
submerged "closure" become control points for the flow and the channel alignment would be expected to develop similarly to
Figure 38. This is a very natural alignment for the river and should not impact unduly on the long term evolution of the river
or the inclination of the river to meander to either the north or the south. It would be expected to result in increased velocities
and greater depths adjacent to the end of the training wall and along the river side of the curved "closure", but it is expected
that while the performance of the structure may vary slightly, it should continue to mitigate erosion levels, preventing
breaching of the Spit and providing improved amenity. Given the fact that the structures are essentially within the 2002
channel alignment, the potential impact of the works on the river system would be expected to be similar to that experienced
in 2002.




                                                      61
                                           Ads= -_^i^3E F! j                    ^.                 : .                p•
                                                                                                               A& lo- ,;        A
Figure 38: Likely future channel alignment for Option E, similar to 2002 alignment

The potential impacts of Option D3 include:
               •    Reduced erosion along the length of the Noosa River Spit
               •    Threat of breaching eliminated
               •    No further erosion at end of Noosa River Spit
               •    Possible end effects may result in increases to erosion of mangrove area at end of the Noosa River Spit
                    [presently experiencing high levels of natural erosion]
               •    Erosion further upstream not anticipated
               •    Naturally active sand shoals may be affected
               •    Potential impact on river evolution similar to 2002 conditions

This option should be effective at stabilizing the full length of the Noosa River Spit and creating a calm lagoon area and
recreational beach while also minimizing the impact of the works on the river dynamics.

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.