Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
Table 2: Preliminary cost estimate for submerqed "closure"
Qty Rate Amount
ex-GS
Establishment $100,000
Excavation [dredging] and nourishment / backfill 22.000 m3 S12 $265,000
Supply mega-containers [vandal resistant eotextile 60 511,620 $700,000
Place and fill mega-containers 60 $6,000 $360,000
Water quality testing Allowance only $30.000
Project management 5% $60.000
TOTAL $1,515,000
6.2. Training Wall
A range of materials were considered for this component, including:
• Rock
• Sand-filled geotextile mega-containers
• Combination
Figure 43: Training Wall constructed using rock or sand-filled mega-containers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.