Development Application - Part 2 of 2 - Report & Plans · OPW11/0116

of 79

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (13.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                        HAT



                Scour                                                                                Scour

                                                                                                                Seabed [varies]



Figure 48: Preliminary design of groynes

The groyne has been designed as an emergent structure. The crest height has been nominated as approx. 1 m above HAT
to allow for wave action without significant overtopping. The base of the structure is variable to reflect changing surface
levels along the length of the structure. As a minimum the base containers should be 0.7m below the surface level [greater
at the head of the groyne] with scour containers to accommodate greater erosion.

Preliminary estimates have been prepared [Table 9]. It is noted that this is based on existing surface levels and could vary if
levels change.

Table 9: Preliminary cost estimate for 2 groynes
                                                                       Qty                  Rate                Amount
                                                                                                                [ex-GST]
Establishment                                                                                                   $100,000
Supply of 2.5m3 containers [standard]                                  175                  $300                 $52,000
Supply of 2.5m3 containers RP                                          260                  $185                $48,000
Dredging to provide suitable sand stockpile                          1,087 m3                $12                 $13,000
Fill & placement of 2.5m3 containers                                    435                 $280                $122,000
Project mans ement                                                                           5%                 $15,000
TOTAL                                                                                                           $350,000

     6.5.   Dredging

There is an existing secondary southern channel [Figure 13] which is proposed to be deepened slightly to provide adequate
navigation after closure of the primary southern channel by the proposed works. Existing depths are presently approx. -0.5m
AHD. It is proposed to deepen this channel to approx -2m AHD (-1m LAT). The proposed deepening will require the
removal of approx. 10,000m3. Material is to be placed as foreshore nourishment and/or backfilling adjacent to structures as
required.

Table 10: Preliminary cost estimate for dredqin
                                                                       Qty                  Rate                Amount
                                                                                                                ex-GST]
Establishment                                                                                                   $100,000
Dredging / Nourishment                                              10,000m3                $12                 $120,000
Project management                                                                          5%                   $10,000
TOTAL                                                                                                           $230,000



     6.6.   Total Strategy

Preliminary costs associated with the complete strategy [Figure 39] are as per Table 11.

Table 11: Summary of costs
                                                                       Amount
                                                                      [ex-GSTJ
Submerged closure                                                    $1,280.000
Training Wall                                                        $ 407.000
Revetment Wall                                                       $ 665.000
2 Groynes                                                            S 350.000
Dredging / Nourishment                                               $ 230.000

Used in these records

About this file

File size
13.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Report & Plans.pdf · 13.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.