Council archive · source document
Development Application - Part 2 of 2 - Report & Plans · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
Very large file (13.6 MB): may take a few minutes to open.
Crest Might such r 4A structure Is lev al with
NSt (or as dose as prlttabb). Wit be
overtopped on Ngh dales.
2. Exunl of works to be res olcud to limits
shown on drMNps. Contetler anflpurwon
to achIM design may very.
3. For esavedon notes. sae drawing NRS-006.
4. Optional additional oonWUr may be placed
as pan of Initial works or pbcW IN required)
In response to monltodng.
Backfill if required 5. Refer to additional drawings
F Anticipated excavated profile Plan layout NRS-005
Top of bank Notes NRS-O11
[may vary]
Level with Adjacentlop.QLBank - - - -------------------------------HAT
-------------------------------MHWS
---------------------------- AHD
-------------------------------MLWS
LAT
Optional 1 m geotextile tube with flap
[if required]
FTR1.-N : TIM 4,U lNoRIioMN U+1LV 4UA
International
Coastal
Management
A••s"tl 's 11i4 1r& 4:'7 d;e Awes
v VI ftw J'o 4aMlyd OIL Q11 An b
L.. 'l .47 ypow 2L -01116.721'47
NOOSA RIVER SPIT
WALL TYPICAL CROSS-SECTION
NRS-007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application - Part 2 of 2 - Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 13.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.