Original source · versioned page text
Attachment C - Stormwater Mangement plan
Plans and drawings: the text below has words only, no drawings.
Site 506m?
Roof 250m?
Driveway 29 m?
Landscape 227 mm
New impervious 279m?
CATCHMENT AREAS
Li on ee ee eee eee 600sq ELEVATED, HINGED: STANDARD #1050 PRECAST CONCRETE
| SURCHARGE GRATE RETENTION & INFILTRATION CHAMBER TYPE
IL8.000 ROCLA OR EQUIVALENT SL8.000
LJ
NOTES ROOF DRAINAGE: | : fs
(y 1. NO BOX GUTTERS ARE PERMITTED
2. DESIGN EVENT FOR ROOF DRAINAGE IS Q20 | 150 * ~
3. DISCHARGE ALL DOWN PIPES TO INFILTRATION - %1050 o :
CHAMBER IL7.600 | Le
4. ROOF DRAINAGE BY CONTRACTOR | : |
T
Co
1500
M FE
ceotextile 7A
S
|
1800
ED AL
MH Powpy
Co
RL6.500
aN
7
|
R
W : J =€-6.1 0-6-6
IL6.200
mm SOBOS t | DSOSOd
S NAY NY NY NYY
—_____NATURAL, SANDY SOIL
THIS PART OF THE CHAMBER IS
O OPERATING THE SILT TRAP AND SHALL
. BE SUBJECT TO REGULAR CLEAN OUT,
CRAVE AND ROCKS MINIMUM YEARLY OR AFTER MAJOR
4 RAIN EVENTS.
@225 SLOTTED uPVC,
WRAPPED IN GEO TEXTILE
—
AND EXTEND INTO SOIL
CL ROOF PLAN 1:100 BELOW
STORMWATER ON SITE SILT
TRAP /INFILTRATION AND
SURCHARGE CHAMBER
SHORT: INFILTRATION
CHAMBER) Drm
SIGNED BY THE PRINCIPAL AND
‘SENIOR DESIGN ENGINEER
DR.—ING. REINHOLD KOENNING
MSC, PHD, MEAUST, AHSCA
DATE AS PER TITLE BLOCK
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
I
| 9150uPVC CAPPED STUB FOR Gl
ij CONNECTION OF ROOF DRAINAGE. Amd Description Date
LOCATION TO BE DTERMINED /
no DURING CONSTRUCTION. ROOF 7 ;
| DRAINAGE BY OTHERS. obvert
i depth at bdy
\ yi ise ae eR oo eo ae eo
I RL.13.81 _ 3
| K ee NY
iy Ri TE PRIVACY | I
| WW —— A YZ Zp 9 JETT Out's aX jj
I ul wauvay a80ve . K 4oeck, # 150uPVC | 80.8 7 XS - A | NEW ARCH LAYOUT; D’°WAY AND CHAMBER REVISED [26-03-21
| | wa f — : | Issue Notes Date
I em -
eo Kb BED 2 || BATH sTuby ¢150uPVC ! For Development Approval
|| no L ST X 3.2 “us P+ x 220 He SSX 4G zon us | s8.8 JA bh For Building Approval 16-02-21
oo > TILES
| ie DECK | oe For Tender x 16-02-21
MAINTAIN UNOBSTRUCTED concosne me XEX AL. 8.42 I | For Construction x 16-02-21
OVERLAND FLOW PATH AT ware 12 a. any ad
ALL TIMES. SHAPE WESTERN Yi oo | || [ As Constructed
FRONTAGE TO FALL TO ose ae J |
OVERLAND ELOW. ete THE cro. 1s e | lI NOTES STORMWATER DRAINAGE:
a (STORAGE 3 |
NORA BOUNDARIES. YENCES SZ 4 YZ | ij 1. ALL IN GROUND PIPES ARE DESIGNED TO OPERATE AT Q100
. RL12.50 Ss I| EVENT LEVEL .
CROSSING THE OVERLAND seieze & meee 3 » - 3 NO 7 | 2. 1%ARI (Q100) TOTAL RUNOFF FROM HARDSTAND AND ROOF Hyd raulic wt
®& q 0 150uPVveexX RL 851 | CATCHMENT AREAS |S: Q=25L/sec '
FLOW PATH SHALL HAVE A I = | a ez, ezza u i
MINIMUM OF SOmm z STORAGE ROSE: ROBE | [| |
GROUND. Powe a ee moeiy 88 7 contact: Reinhold Koenning MigAust AHSCA
o oo t US’
. cor ETE RAMP © m | ,
lI 9 3 BED 3 ques | PO Box 181
I < : GARAGE $150uPVC CAPPED $fUB| FOR—\ |
|| RL12.62 z altos 48 RL.10.55 9 57%58 CONNECTION OF ROdf DRAINAGE. Yo nek RL 8.03 ij Moai! Oecthydcon
PROVIDE A CROSSFALL x CONCRETE LAUNDRY LOGATION TO BE [DTERMINEI XEX RL. 8/72 : 0 1
OF MINIMUM 1:50(2%) 9150uPVC CAPPED STUB FOR— 2.0 4.6 DURING! CONSTRUCTION. Roo L_| | wexreese ot | PH: 0400 886 812
ON CONCRETE DRIVEWAY I CONNECTION OF ROOF DRAINAGE. THES DRAINAGE BY OTHERS! 1] | : | CLIENT :
, LOCATION TO BE DTERMINED ad
NOTE: 15 _ DURING CONSTRUCTION. ROOF ENSUITE TD (A, | | a MAINTAIN 3m MINIMUM R & G BROADHURST
REFER TO STRUCTURAL ~ I DRAINAGE BY OTHERS. L 43X17 7 xEYRL 8.02 Vg, |) By DISTANCE BETWEEN
ENGINEERS pea AND aa E \a ms 7 | | i INFILTRATION CHAMBER DESIGN BY:
‘AWIN: Fe IVEWAY RL.12.30 RL.12.05 RL.10.453 ie a z AND SEWER
LAYOUT. WE CAN NOT ACCEPT e150uPVCN. | Zk WL ZA WL WY i | xex re 7.93 /)) J Ne /NDRSN J
ANY DRIVEWAY LAYOUT WHICH g a d
DOES NOT COMPRISE THE TRAFFICABLE, LINEAL Lf \ ge (erosect: 32 PLOVER STREET ‘
REQUESTED CROSS FALLS. THE 5 PEREGIAN BEACH
DRAIN CHANNEL TYPE — fa — — A
PG TO TOE BOUNDAR US ACO200 WITH INTERNAL \ PRIVATE RESIDENCE
PARAMOUNT AND SO IS THE FALL TO OUTLET xEX RL12-00 eX RNS ee ee ee ex N58 dx A x3x DRAWING TITLE:
50mm STEP UP TO THE FFL OF Cl” 8 ;
THE GARAGE SLAB. WE HAVE 150uPVC @ 150uPVC @ 150uPVC GL 7.80
PROVIDED INDICATIVE SPOT yn eo oe \
LEVELS, WHICH MAY SLIGHTLY BE IL 6.38 |j
CORRECTED BY THE STRUCTURAL ON SITE RETENTION, obvert 6.55 I STORMWATER
ENGINEER. INFILTRATION AND aE ee DRAINAGE
tt SURCHARGE CHAMBER AS len th at bdy /.25 i
i PER DETAILED DESIGN re , ij & MANAGEMENT
ii uf PLAN
| |
Design| RH.| Checked] @h | Date | 16—02—21 | Dwg. No. AMD.
SITEZGROUND PLAN 1:100 3582-2 A
\. scale: 1: 100 ON At UN.O.| 2 Of 2 J
RPD:— LOT 9 P 9313
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original