Original source · versioned page text
2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation
The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Asset Type Tidal Inundation Risk by Year
Present Day 2040 2070 2100
Tourism Low Very High
Business Low Very High
Residential Low
Infrastructure Low High Very High
Recreational16 Low Medium Very High
Natural Low
Table 10 - Change in Noosa Heads asset inundation risk profiles across planning horizons
At present, the only method for mitigating inundation risks in Noosa Heads is:
- Planning and land use regulations are in place for new development including minimum
floor heights for new buildings.
Adaptation outcomes and associated actions – Inundation
The assessment of inundation risks across Noosa heads show the level of risk to some tourism,
business, recreational and infrastructure assets is likely to become intolerable in the later decades
of the century.
Given a range of socio-economic, environmental, and governance considerations, as well as
community feedback during the development of this plan, determine the most appropriate
adaptation pathway for responding to frequent inundation risks in this locality is one that supports
existing accessibility and infrastructure services, as well as current levels of residential, commercial
and retail development. In response to these risks, the preferred adaptation outcomes are:
- Use adaptive landscape design measures to mitigate risk to open space recreation and
road network areas. This may include low level walls, seat and garden beds used to
prevent periodic tidal inundation from spreading into parks and road areas.
- Increasing inundation risks to service infrastructure assets are mitigated through adaptive
design.
16 This result is due to risks to ‘Dog Beach’ and surrounds. Lions Park was rated medium risk by 2100.
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version) Page 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.