Log in to see the plans as drawnAdaptation outcomes and associated actions
The assessment of inundation risks to Tewantin show the level of risk across all asset types in
areas adjacent to the Noosa River will very likely become intolerable within 50 years.
Analysis of socio-economic, environmental, and governance considerations, as well as community
input received throughout the CHAP’s development, indicate the most appropriate adaptation
pathway for responding to inundation risks in this locality is one that supports existing recreational
and visual amenity values, as well as accessibility and infrastructure services. Therefore, the
preferred adaptation outcomes for this locality are:
- Implement measures that protect important recreational areas, stormwater network, road
and footpath assets from periodic tidal inundation
- Where possible, re-locate major recreational and infrastructure assets (e.g. amenities
blocks, the Tewantin water park) outside the projected high-risk foreshore areas by 2070
- Where important recreational assets cannot be feasibly re-located, seek to accommodate
the risks by adapting the design of these assets (e.g. adaptive landscape design) to be
more resilient
- Re-design important road and buried service infrastructure networks to be more resilient to
inundation hazards.
The following actions will help progress the achievement of these outcomes:
MANAGEMENT ACTIONS FOR NEXT 5 YEARS
RESPONSE
AREA
Land Use Maintain existing development requirements.
Planning
Investigate a range of backflow prevention methods and technology for
stormwater network assets identified as vulnerable
Investigate location, scale and design of adaptive landscape structures (e.g.
Public non-intrusive levees, innovative design features for garden beds, public
recreational, furniture, park design and raised foreshore footpaths20) to prevent frequent,
built, and shallow and low flow tidal inundation of Ward Park, RSL Memorial Park, and
Infrastructure Tewantin Park and adjacent parking areas.
assets Investigate road corridor designs that are more resilient to frequent wet/dry
scenarios and incorporate into asset renewal plans where appropriate
Investigate opportunities for maintaining functional approaches to Doonella
Bridge and the ferry to Noosa North Shore
Foreshores and No actions proposed.
Natural Areas
Other No actions proposed.
Other shire wide actions are also identified at the beginning of this Section.
20 Depending on the location requirements, these may range in height up to 300mm in the case of raised
footpaths, or a height consistent with safety regulations in the case of barriers (e.g. approximately waist high)
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version) Page 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.