Skip to the record
Search everything, all in one place.

Original source · versioned page text

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation

of 130

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Adaptation outcomes and associated actions

The assessment of inundation risks to Tewantin show the level of risk across all asset types in
areas adjacent to the Noosa River will very likely become intolerable within 50 years.

Analysis of socio-economic, environmental, and governance considerations, as well as community
input received throughout the CHAP’s development, indicate the most appropriate adaptation
pathway for responding to inundation risks in this locality is one that supports existing recreational
and visual amenity values, as well as accessibility and infrastructure services. Therefore, the
preferred adaptation outcomes for this locality are:

    -    Implement measures that protect important recreational areas, stormwater network, road
         and footpath assets from periodic tidal inundation
    -    Where possible, re-locate major recreational and infrastructure assets (e.g. amenities
         blocks, the Tewantin water park) outside the projected high-risk foreshore areas by 2070
    -    Where important recreational assets cannot be feasibly re-located, seek to accommodate
         the risks by adapting the design of these assets (e.g. adaptive landscape design) to be
         more resilient
    -    Re-design important road and buried service infrastructure networks to be more resilient to
         inundation hazards.

The following actions will help progress the achievement of these outcomes:

 MANAGEMENT             ACTIONS FOR NEXT 5 YEARS
 RESPONSE
 AREA

 Land Use               Maintain existing development requirements.
 Planning

                        Investigate a range of backflow prevention methods and technology for
                        stormwater network assets identified as vulnerable

                        Investigate location, scale and design of adaptive landscape structures (e.g.
 Public                 non-intrusive levees, innovative design features for garden beds, public
 recreational,          furniture, park design and raised foreshore footpaths20) to prevent frequent,
 built, and             shallow and low flow tidal inundation of Ward Park, RSL Memorial Park, and
 Infrastructure         Tewantin Park and adjacent parking areas.
 assets                 Investigate road corridor designs that are more resilient to frequent wet/dry
                        scenarios and incorporate into asset renewal plans where appropriate

                        Investigate opportunities for maintaining functional approaches to Doonella
                        Bridge and the ferry to Noosa North Shore

 Foreshores and         No actions proposed.
 Natural Areas

 Other                  No actions proposed.


Other shire wide actions are also identified at the beginning of this Section.

20 Depending on the location requirements, these may range in height up to 300mm in the case of raised

footpaths, or a height consistent with safety regulations in the case of barriers (e.g. approximately waist high)
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version)            Page 56
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 1 - Coastal Hazards Adaptation Plan for Community Consultation(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.