Log in to see the plans as drawnAdaptation outcomes and associated actions
The assessment of inundation risks to these localities show the level of risk to most asset type is
acceptable, with the exception of risks to natural areas expected to become intolerable by 2070.
Analysis of socio-economic, environmental, and governance considerations, as well as community
input, indicate the most appropriate adaptation pathway for responding to inundation risks in this
locality is one that seeks the continuing provision of key infrastructure services over the medium- to
long-term. As a result, the preferred adaptation outcome21 for this locality is:
- Service infrastructure assets accommodate the increase in inundation risk through adaptive
design.
The following actions will help progress the achievement of these outcomes:
MANAGEMENT ACTIONS
RESPONSE
AREA
Land Use Maintain existing development requirements.
Planning
Public Assets and Investigate a range of backflow prevention methods and technology for
Infrastructure stormwater network assets identified as vulnerable
Foreshores and No actions proposed.
Natural Areas
Other No actions proposed.
Other shire wide actions are also identified at the beginning of this Section.
21 The risk to natural assets in this locality will be addressed via Shire-wide adaptation outcomes
Noosa Council – Coastal Hazards Adaptation Plan 2020 - 2030 (community consultation version) Page 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.