Original source · versioned page text
16-001014-116(A)
From the archive Proposal Plans 1 of 2.zip, inside Operational Works Application OPW16 /0203 - 1 of 4. File date in the archive: 2016-09-12 16:21.
1. NOTWITHSTANDING THE STORMWATER STRUCTURE LEVELS SHOWN, THE COVER OR GRATE LEVEL SHALL SUIT THE FINISHED SURFACE PROFILE. 2. THE PIPE CLASSES HAVE BEEN DESIGNED FOR SERVICE LOADS ONLY. THE CONTRACTOR SHALL ASSESS ANTICIPATED LOADS AND UPGRADE THE PIPE CLASSES IF NECESSARY IN ACCORDANCE WITH AS 3725-2007. x CRACKED PIPES WILL NOT BE ACCEPTED. > 3. CONTRACTOR TO CHECK EXISTING I ey ass 5 N STRUCTURE ale er > NAME = oO Ss 2 Ss = eas als = G B STRUCTURE wie als alge Bla«x = BIS « DESCRIPTION geo 3 S\Z Zia 2\*2 2 2/2 abe 4 ees 2] of =e HES at Ele gle 8) blz SIE ze algz 3/2 & Ble 38a es Bee 2|6 8 als clRS 5/8 NOTE: SEWER LINE_7 150mm 1L100.1 CONNECTIONS PRIOR TO CONSTRUCTION. | 4, SURCHARGE DURING A Q100 EVENT IS PICKED UP PARTIALLY DOWNSTREAM AND THE REMAINING CONTRIBUTES TO OVERLAND FLOW. FLOOD WIDTHS DO NOT EXCEED ROAD RESERVE DURING MODELLED 100 EVENT 5. DRAINAGE SYSTEM FOR STAGE 2 HAS BEEN DESIGNED TO MAXIMISE CAPTURE AND MINIMISE OVERLAND FLOW DUE TO LARGE UPSTREAM CATCHMENTS. LINE U DESIGNED TO CONVEY Q1 FLOWS FROM FUTURE AGED CARE DEVELOPMENT. H.G.L. ANALYSIS CONFIRMS PIPE HAS CAPACITY FOR Q1 FLOWS Qtoo H.G.L. (TYPICAL) SEWER LINE 7. 150mm 1L104.64 Qto H.G.L. (TYPICAL) LINE 15 HAS BEEN DESIGNED TO CAPTURE 100% OF EXTERNAL CATCHMENT Q100 FLOWS PIPE SIZE mm (Class) 525 525 525 750 (BLACK (BLACK (BLACK (2) MAX) MAX) MAX) PIPE GRADE (%) 0.40%_|_ 0.40%, |_ 0.40%. 2.00% PIPE SLOPE (1 in X) 250.36 250.00 250.00 50.00 FULL PIPE VELOCITY (m/s) 4.55 4.55 1.55 4.05 PART FULL VELOCITY (m/s)} "= | 3 | 5 310 88.0 93.0 7 W.S.E_IN STRUCTURE “POS TRF IP IF PIPE FLOW 0.335, 0.335 0,335 0.463 (Cumecs) PIPE CAPACITY 0.272 0.272 0.272 1.575 AT GRADE (Cumecs) DEPTH TO INVERT Foos|e s/s s/s fs =F INVERT LEVEL a2 se SF ss & a8 OF DRAIN BFF BP Fle OF =F DESIGN SURFACE Se 7 LEVEL pF 7 COORDINATES a he RUNNING =] crus] rsoa| 2c] S| seam CHAINAGE LINE U 15 N.S.C. REF NO. MCU15/0111 & REC15/0031 fast [ocelot AMENOMENT DETALS besion cwecx| a menor" SURVEYOR: ML_SURVEYS “ ae “STORMWATER DRAINAGE ale e + aa ISSUED FOR CONSTRUCTION - PENDING COUNCIL APPROVAL Ee to00 — —— — 3 feb see Pee a are @risurieye ten.au PALM LAKE ‘works PTY ILD C= o, V—_T LONGITUDINAL SECTIONS ae a a RE sp — - . “a i OT an a fas | Jha eon PALM LAKE ASORT CaliOre BEB cement mr SETS OF 8 HE wens Fa ok BEML oF CALERECORSILIG LD PY LID STAGE 2 CONSULTING Se Be 16-001014-116 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.