Original source · versioned page text
Meeting minutes
ORDINARY MEETING | 17 SEPTEMBER 2026
For: Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr
Nicola Wilson
Against: None
5 PETITIONS
Nil.
6. PRESENTATIONS
Nil.
7. DEPUTATIONS
7.1 DEPUTATION APPLICANT: ANDREW SAVAGE, ROSEMARY BAKER, BRADLEY
SIMPSON
TOPIC: PROPOSED AMENDMENT NO. 4 TO THE NOOSA PLAN - EMPLOYMENT
LAND AT 94 AND 170 HOLTS ROAD, COOROY
SPEAKERS: ANDREW SAVAGE, ROSEMARY BAKER, BRADLEY SIMPSON
8. PUBLIC QUESTION TIME
8.1 JOANNE HOEY
QUESTION 1.
What current, site-specific expert reports did Council rely on to select 94 and 170 Holts
Road for industrial rezoning? In particular: hydrology, water quality/contamination,
geotechnical, ecological and traffic assessments dash; and will Council publish those
reports in full before making a final decision?
Response provided by Kim Rawlings, Director Strategy & Environment
The subject sites were included by the State in the Urban Footprint as part of the 2023
Regional Plan Review specifically for Employment/ Industrial development. Council did
not commission standalone, site-specific reports for the purpose of determining the
proposed rezoning. Council’s assessment of the suitability of the site for industrial
zoning was informed by a range of existing technical information and mapping,
including overlay mapping in Noosa Plan 2020, which identified characteristics such
as Biodiversity, Bushfire, Landslide and Regional Water Catchment Area. Planning
overlays are based on technical analysis undertaken by both the State Government
and Council.
The proposed Environmental Management & Conservation zone is applied over the
constrained areas. Requirements for onsite water sensitive urban design solutions for
stormwater management and reticulated water and effluent disposal are included in
Noosa Plan 2020. SEQ Water have not raised any additional requirements as part of
the proposed amendment in relation to development in the water catchment area.
Traffic modelling undertaken in 2026 considered the development of the site for
employment land as proposed by Amendment No. 4. This modelling did not identify a
requirement for significant upgrades to the existing local road network surrounding the
site or within Cooroy town centre.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original