Our Ref: 20210473

89

         Noosa Council
         PO Box 141
         Tewantin QLD 4565
         Via email: [email protected]

         Attention: Development Assessment Team

Dear Sir/Madam,

DEVELOPMENT    APPLICATION    FOR    OPERATIONAL WORKS
(ENGINEERING, DRIVEWAY, DRAINAGE AND EARTHWORKS) AT 42
LUKES ROAD, COOROY MOUNTAIN (LOT 77 ON MCH546)

Please find enclosed a development application for Operational Works to be assessed by Noosa
Council. In support of this application please find enclosed:

     ●   DA Form 1;
     ●   Engineering OPW Plans prepared by Westera Partners.

Payment of the relevant fee will be made once a reference number and invoice has been
received.

PROPOSED DEVELOPMENT

The attached documentation has been prepared by accordance with the requirements of Noosa
Planning Scheme 2020 and the relevant MCU22/0357 conditions or approval as outlined in the
table below:

                   Condition                                    Response

 18. A sealed access driveway must be Please refer to Engineering Plans.
 provided from Lukes Road to all parking and
 manoeuvring areas of the development. The
 works must be undertaken in accordance with
 an Operational Works approval and must be
 in accordance with Noosa Council Standard
 Drawing RS-056 and generally in accordance
 with      Westera    Partners’      drawing
Log in to download the original file

Cover Letter .pdf · 182 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

 S22-121-SW01 dated August 2022 and any
 associated addendum.

 19. Stormwater runoff from the development Please refer to Engineering Plans.
 must be disposed of on-site without causing
 scour or damage to the subject site or any
 adjoining property. The works must be
 undertaken in accordance with an Operational
 Works approval and be generally in
 accordance     with     Westera    Partners’
 Stormwater Management Report dated 22
 August 2022.

 22. All fill and associated batters must be Please refer to Engineering Plans.
 undertaken in accordance with an Operational
 Works approval, and contained entirely within
 the subject site unless written permission
 from the respective landowner(s) is provided
 to Council.

We thank Council for assessing the above application. Based on the information provided in this
application we respectfully request that Council proceed to issue a development permit.

If you have any questions with respect to the above, please do not hesitate to contact Adapt
Development Management Pty Ltd.

Yours faithfully,
Adapt Development Management Pty Ltd




Tiani Boulton
Director
E: [email protected]
M: 0404924160




                                                                                              2

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.