Engineering Report · MCU18/0094
Attached to the e-mail Multiple Housing Type 4 Conventional - 4 units (Covering letter, DA Form 1, Eng Plans, Eng Report, Owners Consent, Planning Report , Traffic Report) - MCU18/0094.
Emt A
ROADWORKS NOTES: REINFORCED CONCRETE NOTES:
GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD SPECIFICATIONS
AS 3600 "SAA CONCRETE STRUCTURES CODE".
SP248154
SP281569
1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH IPWEAQ &
CP
CP
LOCAL AUTHORITY STANDARDS. IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD
SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY:
2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE AS 1012 PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS).
LANDSCAPE ARCHITECT'S DESIGN DRAWINGS. AS 3583.1,2,3,8 METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS.
IL:112.61
MATERIALS FOR USE WITH PORTLAND CEMENT.
RL
0
3. ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE A MINIMUM DRY
4.1
AS 3582.1 SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH PORTLAND
11
11
4.0
RW1
5
0
5
4.1
4.2
4.2
RL
70
11
11
11
3
DENSITY RATIO (M.D.D.R.) OF 100% STD.
RL
RL
RL
RL
CEMENT- FLY ASH.
4.3
11
RL
11
'B1'
4.3
11
RL
0
4.0
AS 1141 METHODS FOR SAMPLING AND TESTING AGGREGATES.
80
50
5
4.3
AS 1302 STEEL REINFORCING BARS FOR CONCRETE.
4.2
4. ALL CONDUITS TO BE IDENTIFIED BY BRASS PLAQUES ON KERB AND
11
11
RL
RL
'B1' 'B1'
GARNET STREET
AS 1303 HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE.
114
CHANNEL AS PER IPWEAQ STANDARD DRAWING R-0160 U.N.O.
50
4.3
11
AS 1304 HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR CONCRETE.
RL
5
0
4.2
5
4.3
4.3
11
AS 3972 PORTLAND AND BLENDED CEMENTS.
11
11
C56011
GARAGE GARAGE GARAGE GARAGE
RL
RL
RL
916
FFL114.4 FFL114.4 FFL114.4 FFL114.4
5. WHERE CONCRETE DRIVEWAYS ABUT KERB & CHANNEL, THE
RW1
AS 1379 READY-MIXED CONCRETE (METRIC UNITS)
PROPOSED PROPOSED PROPOSED PROPOSED CONTRACTOR IS TO CONSTRUCT A COMMERCIAL CROSS-OVER IN
RW1
AS 2758 PART 1 CONCRETE AGGREGATES.
00
TOWNHOUSE 4 TOWNHOUSE 3 TOWNHOUSE 2 TOWNHOUSE 1
4.4
ACCORDANCE WITH IPWEAQ STANDARD DRAWING RS-051.
11
RL
AS 1478, 1479 CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN CONCRETE.
0
4.4
11
AS 3610 FORMWORK FOR CONCRETE.
WM
RL
FFL114.5 FFL114.5 FFL114.5 FFL114.5
6. PROVIDE ENERGEX AND TELSTRA CONDUITS UNDER DRIVEWAYS & SUPPLY:
FOOTPATHS (IF REQUIRED).
RW2
· ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. NO ON SITE
BATCHING IS ACCEPTABLE.
00
00
4.4
4.4
7. CONTRACTOR TO INSTALL 2 No. "HAZARD" SIGNS AT THE END OF
11
·
11
MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE AND
RL
RL
RW2
3
0
STAGED ROADWORKS. BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.
.78
.27
4.2
115
14
14
11
L1
1
RL
RL
R
· ALL MATERIALS, STORAGE, BATCHING, ETC. TO CONFORM TO THE REQUIREMENTS OF THE RELEVANT
Ex
Ex
8. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA AUSTRALIAN STANDARDS.
0
4.3
11
· ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.
RL
PROJECTS STANDARD SPECIFICATION & LOCAL AUTHORITY
· ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN.
REQUIREMENTS.
· ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.
· ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
11
4 9. ROADWORKS AND DRAINAGE SET-OUT INFORMATION IS AVAILABLE CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE
.25
0
5
H
14
4.2
4.1
1
E/O
11
11
FOR THE CONTRACTOR VIA COMPUTER MODEL PROVIDED BY ALTA
RL
REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE.
RL
RL
115
PROJECTS. HOWEVER, ALTA PROJECTS ACCEPTS NO RESPONSIBILITY · ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
FOR INCORRECT SETOUT FROM THE DATA PROVIDED. CONTRACTOR COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.
WATTLE STREET SHOULD CONFIRM THE CORRECT COORDINATES WITH THE · ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.
H
E/O HORIZONTAL CURVE DATA PROVIDED ON THESE DRAWINGS. FORMWORK:
· ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD
CARPARK/ INTERNAL PAVEMENT NOTES OR STEEL FORMS.
OVERALL SITE PLAN · ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 1509 AND AS 1510.
· THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALTA PROJECTS STANDARD · REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
SCALE 1:250 A1
SPECIFICATIONS, IPWEAQ, LOCAL AUTHORITY AND DEPARTMENT OF TRANSPORT AND MAIN FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE.
ROADS (DTMR) AND AUSTRALIA STANDARDS. ANY CONFLICTS SHALL BE REFERRED TO THE · ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
ENGINEER FOR CLARIFICATION. BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.
· ALTA PROJECTS HAVE NOT UNDERTAKEN A RISK ASSESSMENT OF THE PROPOSED CARPARK · ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE CHAIRS
DESIGN AND LAYOUT WITH RESPECT TO TRAFFIC OR PEDESTRIAN SAFETY, TRIP HAZARDS, TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE UNDERLAIN BY
WPHS REQUIREMENTS ETC. SPECIALIST ADVICE SHOULD BE SOUGHT IN THIS REGARD. WATERPROOF MEMBRANE.
SETOUT TRANSPORT:
· EXISTING SURFACE LEVELS AND CONTOURS SHOWN ARE BASED ON DIGITAL SURVEY · ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.
MODELS PROVIDED. EXISTING LEVELS MUST BE CONFIRMED ON SITE BY THE CONTRACTOR · CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT
AND ANY DISCREPANCIES REFERRED TO THE ENGINEER. THE ENGINEER'S DISCRETION.
· ALL CARPARK SETOUT TO BE AS PER DIGITAL CO-ORDINATES OR DIMENSIONED DRAWINGS PLACEMENT, COMPACTION AND FINISHING:
PROVIDED. CONTRACTOR MUST NOT RELY ON DIGITAL DRAWING FILES OR SCALING OF · CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M, CONCRETE
DRAWINGS. PUMPING OR KIBBLING.
SUBGRADE · UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW HORIZONTALLY BY USE OF
· SUBGRADE SHALL BE OF SOAKED CBR 5 MATERIAL OR BETTER, FREE FROM TOPSOIL, VIBRATORS.
· ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED
ORGANIC OR OTHER DELETERIOUS MATERIAL.
IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS
· SUBGRADE SHALL BE COMPACTED TO 97% MDD (AS 1289 E1.1) AND SHALL NOT SHOW DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.
MARKED DEFLECTION UNDER 8 TONNE AXLE LOAD AT PROOF ROLL. · ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 50mm DIAMETER VIBRATORS.
· ANY SOFT SPOTS SHALL BE EXCAVATED TO COMPETENT MATERIAL AND REPLACED WITH · SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE
SELECT MATERIAL FROM SITE OR TYPE 2.5 GRAVEL AT THE ENGINEER'S DIRECTION. SURFACE,
· SUBGRADE SHALL BE GRADED TO PROFILES MATCHING FINISHED SURFACE AND ALL AREAS DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
SHALL DRAIN TO SUBSOIL DRAINS. · ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
· SUBSEQUENT PAVEMENT LAYERS MUST NOT BE PLACED UNTIL THE ENGINEER HAS WIND BREAKS, ETC. MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
UNUSUALLY HOT, DRY OR WINDY CONDITIONS.
APPROVED ALL TEST RESULTS, SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT AND THE
· ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.
ENGINEER HAS PROVIDED WRITTEN APPROVAL TO PROCEED. · BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING.
· · ALL CONCRETE TO BE ORDERED AND PLACED AT 80MM SLUMP UNLESS NOTED OTHERWISE.
GRANULAR PAVEMENT · NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.
· FINAL PAVEMENT DESIGN SHALL BE DETERMINED BY THE ENGINEER UPON RECEIPT OF
SUBGRADE SOAKED CBR RESULTS AFTER THE COMPLETION OF BULK EARTHWORKS. TESTING:
· ALL GRANULAR PAVEMENT SHALL COMPLY STRICTLY WITH ALL CURRENT DTMR QUALITY · ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY,
IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.
STANDARDS FOR THE NOMINATED PAVEMENT TYPE AND SHALL BE SUPPLIED BY A DTMR
· THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
ACCREDITED QUARRY. OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM :
· PAVEMENT PLACEMENT SHALL NOT COMMENCE UNTIL MATERIAL QUALITY TEST RESULTS - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
HAVE BEEN APPROVED BY THE ENGINEER. GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)
· PAVEMENTS SHALL BE PLACED AT DEPTHS NOT EXCEEDING 200mm AND SHALL BE - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH
COMPACTED TO 100% MDD (AS 1289 E1.1), SLURRIED AND TRIMMED TO PROFILE REFLECTING GRADE CAST ON ANY GIVEN DAY.
FINAL DESIGN SUCH THAT A TIGHT PAVEMENT MATRIX IS ACHIEVED. - A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 50m³ OR PART THERE OF
· WHERE CEMENT TREATMENT IS NOMINATED BY THE ENGINEER CEMENT DESIGN AT THE CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.
· ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE.
NOMINATED RATE MUST TAKE PLACE AT AN ACCREDITED PUG MILL. NO ON-SITE CEMENT
· IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING
TREATMENT WILL BE ACCEPTED. SHALL BE TAKEN AFTER THE ADDITION OF WATER.
· ASPHALT PRIME SHALL NOT BE PLACED OVER BASE COARSE PAVEMENT UNTIL:
- ALL TEST RESULTS HAVE BEEN APPROVED. CURING:
- A SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT. ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER FINISHING.
- AS CONSTRUCTED SURVEY HAS BEEN APPROVED. · CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND SHALL
- ENGINEERS WRITTEN DIRECTION TO PROCEED IS OBTAINED. GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS :
- CONTINUOUS WATER PONDING.
- COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).
- APPLICATION OF AN APPROVED CURING COMPOUND.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: WM PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: NG PRELIMINARY ROADWORKS OVERALL SITE PLAN & NOTES
FOR APPROVAL Date: FEB 2017
A.B.N. 91 611 354 511
26 Memorial Avenue, Cotton Tree PROPOSED MULTIPLE HOUSING DEVELOPMENT
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked: . . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 15 GARNET STREET, COOROY DRAWING No:
A6265/18/PR01 B 1 of 1
Email: [email protected]
B
A
25/05/18
08/03/18
FOR APPROVAL ISSUE
FOR APPROVAL ISSUE
NG
NG
SH
SH
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for THE WHATHAM BOYS PROPERTY TRUST.
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : A6265-18-R01-R02.dwg - DATE : 25/5/18 - 4:52pm - XREF's: X-BASE; X-SURVEY; X-ARCH (B) Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.