Engineering Report · MCU18/0094
Attached to the e-mail Multiple Housing Type 4 Conventional - 4 units (Covering letter, DA Form 1, Eng Plans, Eng Report, Owners Consent, Planning Report , Traffic Report) - MCU18/0094.
Existing Garnett Street Catchment:
Area: 33,476m2
Time of Concentration: 8.5min
Peak Flow (Q100/Q10): 2.15/1.39 m3/s
Additional Catchment from Subject Site:
Area: 375m2
Time of Concentration: 5min
Peak Flow (Q100/Q10): 0.028/0.019 m3/s
Combined Catchment:
Area: 33,851m2
Time of Concentration: 8.5min
Peak Flow (Q100/Q10): 2.17/1.41 m3/s
Peak Garnet Street Flow Increase:
(Q100/Q10): 1.3%/1.37%
Garnet Street Kerb Flow Capacity (Northern side):
Existing Catchment Additional Catchment
Q10 = 0.065 m3/s Q10 = 0.09 m3/s
d = 68mm d = 76mm
d*V = 0.14 m2/s d*V = 0.17 m2/s < 0.4 m2/s (QUDM 2017 – Table 7.04.1)
Flow Width = 1.43m Flow Width = 1.69m
Q100 = 0.095 m3/s Q100 = 0.132 m3/s
d = 77mm d = 85mm
d*V = 0.15 m2/s d*V = 0.17 m2/s < 0.4 m2/s (QUDM 2017 – Table 7.04.1)
Flow Width = 1.73m Flow Width = 1.99m
___________________________________________________________________________________
A6265 -18- Engineering Report – Garnet Street, Cooroy Page 4 of 4
Mar 2018 SH/tk
Alta Projects P/L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.