Council archive · source document
Change to Sewer Connection plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
KEY PLAN
fiTS
APPROVED
D REYNOLD
RPEQ CERTIFICATION APPLIES FOR THE FOLLOWING
COMPONENTS:
WATERMAIN CONNECTION DAVID LOWWAY/GREBE
STREET
RELOCATION OF SEWER MANHOLE NORTH WEST
CORNER OF SITE
STORMWATER LINES
Flt1 -
SP1
Flt2 -
OUTLET
GPT -
SW M/H -
OUTLET
C,P2 -SP2
C,P1 EX SW M/H
-
K 14.06.12 SRlRllWAlER Ll\ti:S RE’I1SED .IS
J 31.05.12 STORlAlER I’IPEWORK REVISED .IS
H 23.02.12 SW 1REATllEIIT AMENDED .IS
G 17.11.11 STAGE 1 STORlIWAlER ADDED .IS ~
F 16.11.11 ~NG COUNOl Rf1 .IS
16.6 E 02.09.10 ISSUE FOR APPROVAL .IS t-
o 01.09.10 ISSUE FOR APPROVAL .IS
C 13.08.10 ISSUE FOR APPROVAL .IS
B 14.07.10 PREU"INARt ISSUE .IS
L 17.09.12 SFIIER DIVERSION RE\1SED .IS
ISSUE DATE REVISION DES""ED
SPICE CONSULTING
r1i
UENT
OSSA
CONSTRUCTION HYDRAULICS CONSULTANTS
PO SOX 1406 SUDERIM 0 4556
Telephone 07 5445 3888
Facsimile 07 5445 3824
1124616 Emoil [email protected]
-
CONTRAST CONSTRUCTIONS P/L
~
AHSCA
-~
I-
DRAWING LEVa: AHD
:
PART SITE PLAN 2 of 2
! /""-
SEWER & STORMWATER
SCALE: I~I-
A1- 1:250
DIVERSION PLAN
~- 1:500
00
o
PROJECT A,u.
ESSENCE APPROVAL rSSUE’ I-
PART SITE PLAN 2 of 2 L
SCAlE 1 :250
MIXED USE DEVELOPMENT
DAVID LOW WAY
D9G 40._ OP2!
SHEET,
PEREGIAN BEACH 2 OF 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Sewer Connection plansRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.