Council archive · source document
Geotechnical Investigation Report · OPW26/0149
PTG/04982 – 0001 – Rev0 – Rev0
Due to the low permeability of the site soils, it is recommended to use a package wastewater treatment plant with
final effluent being pumped to a disposal field comprising dripper lines within a specifically designated area.
Stormwater from roofs and hard standings that is not captured for re-use should be directed to safe discharge
locations that are away from the new cabins, and downslope of any steeply sloping areas. Stormwater may be
discharged to the dam pond, but should be attenuated to avoid shocking the pond with sudden discharge volumes
which could overwhelm the primary discharge point. Where excess stormwater is not directed to the pond, it should
not be allowed to discharge directly on to the ground surface in an uncontrolled manner as this could result in softening
of the soil, scour erosion and/or unintended slope instability issue.
9.5 CONSTRUCTION OBSERVATIONS
In order to confirm the assumptions and recommendations made in formulating this report, we recommend that a
Registered Engineer who is both experienced in the field of soil mechanics, and who is also familiar with the contents
of this report, be retained in order to inspect the ground conditions at the time of the site formation works and
foundation/retaining wall construction. Should the ground conditions be found to be markedly different to those
encountered during our investigation, provision should be made for amending the foundation and retaining designs as
determined necessary by the inspecting engineer in agreement with the structural engineer for the project.
10 LIMITATIONS
PTG Consulting has prepared this report (or services) for this project in accordance with PTG's proposal and
acceptance received from the Client. These limitations apply whether the report was created under PTG’s own terms
and conditions or otherwise.
This report is provided for the exclusive use of the SCG Consulting Engineers for the Geotechnical scope of works at
87 Hayward Road, Lake MacDonald. The report should not be used by or relied upon for other projects or purposes
on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose
as stated above, and without the express written consent of PTG, does so entirely at its own risk and without recourse
to PTG for any loss or damage. In preparing this report, PTG has necessarily relied upon information provided by the
client and/or their agents.
PTG's advice is based on information gained from limited subsurface excavations and sampling supplemented by
knowledge of local geology and experience. The accuracy of the advice provided by PTG in this report may be affected
by undetected variations in ground conditions across the site between and beyond the sampling and/or testing
locations. For this reason our reports include an interpretation of conditions between the test points. There are
unknowns or variations in ground conditions between test locations that cannot be inferred or predicted. Such
variations may occur after PTG's field testing has been completed. The precision and reliability of interpretive
assessment between discrete points is dependent on the uniformity of the subsurface strata, as well as the frequency,
detail, and method of sampling or testing.
Geotechnical information represents an opinion and is based extensively on judgment of both data and interpretive
assessments or observation. This report and its associated documentation are provided explicitly based on PTG’s
opinion of the site at the time of inspection, and cannot be extended beyond this. Any recommendations or design
suggestions will need to be verified on site during project implementation or construction. Inspection and verification
on site may be conducted by a suitably qualified geotechnical consultant or engineer, and where subsurface conditions
or interpretations differ from those provided in this document or otherwise anticipated, PTG must be notified and be
provided with an opportunity to review the recommendations
The report has been prepared by qualified personnel, and is based on the information obtained from field and
laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. The
information and interpretation may not be relevant if the development proposal is changed. If this happens then PTG
Engineering will be pleased to review the report and the sufficiency of the investigation work.
Every care is taken with the report as it relates to interpretation of subsurface conditions, and the discussion and
recommendations or suggestions relating to the geotechnical aspects of the scope of works. However, PTG
Engineering cannot always anticipate or assume responsibility for:
» Unexpected variations in ground conditions.
» Changes in policy or interpretations of policy by statutory authorities.
» The actions of contractors responding to commercial pressures.
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
Geotechnical Investigation Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.