Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                  Native Foresters


       4.0 IMPACT MANAGEMENT PLAN ACTIONS

TABLE 1: MANAGEMENT ACTIONS – BEFORE CONSTRUCTION
                       1.    To obtain baseline data on EVNT species occurrence within the footprint of proposed works to allow impacts on populations of
Objectives                   these species to be measured.
                       2.    To ensure minimal disturbance of EVNT species habitat is considered during implementation of works.
Responsible
                     Noosa Council
Person:

Compliance           DES Licensing Officer
Officer:

                     TASKS                                                                                                     RESPONSIBILITY        TIMING

Delineation of       Clearly delineate the Construction and No Go Zones                                                        Project Coordinator Prior to
Construction and                                                                                                                                   commencement of
No Go Zones                 NC employees and contractors will be prohibited from entering sensitive EVNT species                                  works
                             breeding habitat areas and retained vegetation located outside the defined
                             clearing/construction zone.
                          Include “No-go” signage around identified habitat areas and movement corridors.
Delineation of       Clearly delineate Fauna Relocation Areas and Monitoring Areas                                             Project               Prior to
Fauna Relocation                                                                                                               Coordinator           commencement
Area and                     Establish Fauna Relocation Area in suitable, undisturbed habitat. This area should contain                             of works
                              appropriate habitat features for EVNT species.                                                   Ecologist
Monitoring Areas
                             Establish monitoring sites (impact and control site) as per methods contained in section 6.1.
Baseline Data        Engage suitably qualified Ecologist/Fauna Spotter-catcher to undertake one baseline monitoring as         Project Coordinator Undertake in
                     follows:                                                                                                  / Ecologist         suitable climatic
                           Undertake one (1) baseline monitoring event. One (1) event is defined as one (1) diurnal hand                          conditions prior to
                              search, one (1) dip-net survey, one (1) visual spotlight search and one (1) aural playback                           commencement of
                              survey at a control site (upstream of works area) and an impact site (which may be directly or                       works
                              indirectly impacted by works within or near works area).
                             The Fauna Spotter-catcher will actively search for EVNT species under vegetation, rock, coarse
                              woody debris and other suitable habitat/refuge including areas of ponded water following
                              methods outlined in Section 6.1.
                             Pre-clearance surveys will be conducted in accordance with the relevant relocation measures
                              outlined in Section 5 and the Interim hygiene protocol for handling amphibians (EHP 2013,
                              Appendix B).




       IMPACT MANAGEMENT PLAN – Noosa Landfill Expansion                                                                                 …14
Log in to download the original file

Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.