Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                          Native Foresters


                                 If any other threatened fauna species are impacted during construction, work will cease in
                                  the immediate vicinity of the sighting until they have moved off or a suitably qualified Fauna
                                  Spotter-catcher called in to remove them.
                                 The Fauna Spotter-catcher will maintain records of all fauna relocated (Appendix C) or
                                  injured (Appendix D) and report to the Site Supervisor.
                                 Prior to clearing and concurrent with the relocation of fauna, all large woody debris and
                                  rocks should be removed and relocated into surrounding natural areas.
Habitat               Erosion and sediment control:
Management
                               Ensure works do not concentrate flows into EVNT species habitat.                                   Site Foreman         As appropriate
Actions
                               Ensure drainage control, erosion control and sediment control is implemented to                                         during
                                reduce impacts such as leaf litter and soil loss, siltation and water quality degradation.                              construction
                      Pest and weed management
                                   Remove environmental weeds during vegetation clearing phase.
Clearing/             Machinery hygiene / operation                                                                                Site Foreman         As appropriate
Construction                                                                                                                                            during clearing
                          Equipment, including tracks and buckets, should be cleaned prior to arrival on site to
                             prevent transfer of fungal pathogens that can impact on frog populations and lead to
                             spread of undesirable weeds.
                          During periods of wet weather site personnel to check under materials and equipment
                             each morning before using to ensure EVNT species are not taking refuge under these
                             items.
                          Contractors/machinery operators should determine suitable locations for dispersal of
                             material (vegetation, soil, silt etc.) removed from EVNT species habitat areas taking into
                             account the need for the Fauna Spotter-catcher to access fauna found alive, injured or
                             deceased in such material.
                      Reduce habitat loss/damage:
                                 Disperse materials (e.g. excavated vegetation, soil, etc) wherever possible to allow fauna
                                  to escape and Fauna Spotter-catcher to inspect. Following a reasonable amount of time
                                  after which no fauna is found, material can be stockpiled or removed from site.
EVNT species         EVNT species breeding habitat assessments following completion of clearing / reprofiling during
breeding habitat     wet conditions                                                                                                Site ecologist /     Throughout       the
assessments
onsite following                 The Ecologist/Fauna Spotter catcher is to attend the site if there is more than 50mm of          Fauna    Spotter-    duration of
                                  rain in the preceding 24 hour period to make determinations regarding breeding activity of       catcher              clearing and
clearing &
                                  EVNT species and the requirement for a Spotter catcher to attend or for works to be                                   reprofiling works.
reprofiling works
                                  suspended in that area.
during wet
conditions




       IMPACT MANAGEMENT PLAN – Noosa Landfill Expansion                                                                                          …17
Log in to download the original file

Attachment 7D - Impact Management Plan - EVNT Fauna species - Noosa Landfill Expansion.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.