Council archive · source document
SUPERSEDED Minor Change Existing Approval 51989.108.16
Officer: Glen Conforti Direct Telephone: 07 53296241 Our Reference: 51989.108.16 Your Reference: n/a 22 January 2021 Carma Building Group 1A/20 Premier Cct WARANA QLD 4575 [email protected] Dear Sir/Madam Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 23 November 2020, requesting a minor change to an existing development approval. Council on 20 January 202, decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: 51989.108.16 Street address: 25 Nannygai St Noosaville Qld 4566 Real property description: Lot 1 SP 141238 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 15 June 1989 – DNA 153 Development Permit for Material Change of Use of Premises - Retirement Village In relation to the request to make a minor change to the existing approval, Council on 20 January 2021, decided to approve the requested changes. The changes are detailed below. Approve the change Change condition 1 currency period of approval The currency period for this development approval is 4 years starting the day that the original development approval (51989.108) took effect assessment manager conditions To be read in conjunction with previous approvals of 51989.108 (DNA153). – copy attached. 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered A444-WD 01A to A444-WD 04A, A368-WD, A368-2 and Proposed Floor Plan, 04122 SD-03 (dated August 2007) and additional approved plans listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date August 2014 – Villas 36 & 47 LRV036 WD-02 A Site Plan, prepared by Carma Building Group 17/03/14 LRV036 WD-03 B Floor Plan, prepared by Carma Building Group 17/03/14 LRV036 WD-06 C Elevations Sheet 1 of 2, prepared by Carma Building Group 22/05/14 LRV036 WD-07 C Elevations Sheet 2 of 2, prepared by Carma Building Group 17/03/14 LRV047 WD-02 A Site Plan, prepared by Carma Building Group 17/03/14 LRV047 WD-03 E Floor Plan, prepared by Carma Building Group 09/06/14 LRV047 WD-06 B Elevations Sheet 1 of 2, prepared by Carma Building Group 22/05/14 LRV047 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 17/03/14 October 2014 – Villas 44, 45, 66 & 67 LRV044 WD-02 A Site Plan, prepared by Carma Building Group Sept. 2014 LRV044 WD-03 B Floor Plan, prepared by Carma Building Group Sept. 2014 LRV044 WD-06 B Elevations Sheet 1 of 2, prepared by Carma Building Group Sept. 2014 LRV044 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group Sept. 2014 LRV045 WD-02 A Site Plan, prepared by Carma Building Group Sept. 2014 LRV045 WD-03 A Floor Plan, prepared by Carma Building Group Sept. 2014 LRV045 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group Sept. 2014 LRV045 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group Sept. 2014 LRV066 WD-02 A Site Plan, prepared by Carma Building Group Sept. 2014 LRV066 WD-03 A Floor Plan Type 2B, prepared by Carma Building Group Sept. 2014 LRV066 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group Sept. 2014 LRV066 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group Sept. 2014 LRV067 WD-02 A Site Plan, prepared by Carma Building Group 20/10/14 LRV067 WD-03 A Floor Plan, prepared by Carma Building Group 20/10/14 LRV067 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 20/10/14 LRV067 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 20/10/14 March 2015 – Villas 8, 23 & 114 LRV008 WD-02 A Site Plan, prepared by Carma Building Group 28/01/15 LRV008 WD-03 A Floor Plan, prepared by Carma Building Group 28/01/15 LRV008 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 28/01/15 LRV008 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 22/01/15 LRV023 WD-02 A Site Plan, prepared by Carma Building Group 13/02/15 LRV023 WD-03 A Floor Plan, prepared by Carma Building Group 13/02/15 LRV023 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 13/02/15 LRV023 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 13/02/15 LRV114 WD-02 A Site Plan, prepared by Carma Building Group 22/01/15 LRV114 WD-03 A Floor Plan, prepared by Carma Building Group 22/01/15 LRV114 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 22/01/15 LRV114 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 22/01/15 August 2015 – Villas 46, 52 & 53 LRV046 WD-02 A Site Plan, prepared by Carma Building Group 09/06/15 LRV046 WD-03 A Floor Plan, prepared by Carma Building Group 09/06/15 LRV046 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 09/06/15 LRV046 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 09/06/15 LRV 052 WD-02 A Site Plan (villas 52 & 53), prepared by Carma Building Group 09/06/15 LRV 052 WD-03 A Floor Plan (villas 52 & 53), prepared by Carma Building Group 09/06/15 LRV 052 WD-06 A Elevations Sheet 1 of 2 (villas 52 & 53), prepared by Carma Building Group 09/06/15 LRV 052 WD-07 A Elevations Sheet 2 of 2 (villas 52 & 53), prepared by Carma Building Group 09/06/15 October 2015 – Villas 34 & 59 LRV 034 WD-02 A Site Plan, prepared by Carma Building Group 28/09/15 LRV 034 WD-03 A Floor Plan, prepared by Carma Building Group 28/09/15 LRV 034 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 28/09/15 LRV 034 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 28/09/15 LRV 059 WD-02 A Site Plan, prepared by Carma Building Group 28/09/15 LRV 059 WD-03 A Floor Plan, prepared by Carma Building Group 28/09/15 LRV 059 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 28/09/15 LRV 059 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 28/09/15 June 2016 – Villas 17, 25, 26 & 55 LRV 017 WD-02 A Site Plan, prepared by Carma Building Group 24/05/16 LRV 017 WD-03 A Floor Plan, prepared by Carma Building Group 24/05/16 LRV 017 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 24/05/16 LRV 017 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 24/05/16 LRV025 WD-02 A Site Plan, prepared by Carma Building Group 24/05/16 LRV025 WD-03 A Floor Plan, prepared by Carma Building Group 24/05/16 LRV025 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 24/05/16 LRV025 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 24/05/16 LRV055 WD-02 A Site Plan, prepared by Carma Building Group and as annotated by Council 24/05/16 LRV055 WD-03 A Floor Plan, prepared by Carma Building Group 24/05/16 LRV055 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 24/05/16 LRV055 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 24/05/16 September 2016 – Villas 16 & 56 LRV016 WD-02 A Site Plan, prepared by Carma Building Group 15/08/2016 LRV016 WD-03 A Floor Plan, prepared by Carma Building Group 15/08/2016 LRV016 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 15/08/2016 LRV016 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 15/08/2016 LRV056 WD-02 A Site Plan, prepared by Carma Building Group 15/08/2016 LRV056 WD-03 A Floor Plan, prepared by Carma Building Group 15/08/2016 LRV056 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 15/08/2016 LRV056 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 15/08/2016 February 2017 – Villas 32, 42 & 61 LRV032 WD-02 A Site Plan, prepared by Carma Building Group 12/12/2016 LRV032 WD-03 A Floor Plan, prepared by Carma Building Group 12/12/2016 LRV032 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 12/12/2016 LRV032 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 12/12/2016 LRV042 WD-02 A Site Plan, prepared by Carma Building Group 12/12/2016 LRV042 WD-03 A Floor Plan, prepared by Carma Building Group 12/12/2016 LRV042 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 12/12/2016 LRV042 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 12/12/2016 LRV061 WD-02 A Site Plan, prepared by Carma Building Group 16/01/17 LRV061 WD-03 B Floor Plan, prepared by Carma Building Group 03/0217 LRV061 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 16/01/17 LRV061WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 16/01/17 July 2017 – Villas 43, 48,& 72 LRV043 WD-02 A Site Plan, prepared by Carma Building Group 12/06/2017 LRV043 WD-03 A Floor Plan, prepared by Carma Building Group 12/06/2017 LRV043 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 12/06/2017 LRV043 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 12/06/2017 LRV048 WD-02 A Site Plan, prepared by Carma Building Group 12/06/2017 LRV048 WD-03 A Floor Plan, prepared by Carma Building Group 02/05/2016 LRV048 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 12/06/2017 LRV048 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 12/06/2017 LRV072 WD-02 B Site Plan, prepared by Carma Building Group 05/09/17 LRV072 WD-03 B Floor Plan, prepared by Carma Building Group 05/09/17 LRV072 WD-06 B Elevations Sheet 1 of 2, prepared by Carma Building Group 05/09/17 LRV072WD-07 B Elevations Sheet 2 of 2, prepared by Carma Building Group 05/09/17 September 2017 – Villas 49 & 73 LRV049 WD-02 A Site Plan, prepared by Carma Building Group 21/08/17 LRV049 WD-03 A Floor Plan, prepared by Carma Building Group 21/08/17 LRV049 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 21/08/17 LRV049WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 21/08/17 LRV073 WD-02 B Site Plan, prepared by Carma Building Group 05/09/17 LRV073 WD-03 B Floor Plan, prepared by Carma Building Group 05/09/17 LRV073 WD-06 B Elevations Sheet 1 of 2, prepared by Carma Building Group 05/09/17 LRV073WD-07 B Elevations Sheet 2 of 2, prepared by Carma Building Group 05/09/17 May 2019 – Villas 29, 30, & 31 LRV029 WD-03 A Floor Plan, prepared by Carma Building Group 01/04/2019 LRV029 WD-06 A Elevations, Sheet 1 or 2 prepared by Carma Building Group 01/04/2019 LRV029 WD-07 A Elevations, Sheet 2 or 2, prepared by Carma Building Group 01/04/2019 June 2020 – Villas 42, 43 & 60 LRV042 WD-02 A Site Plan, prepared by Carma Building Group 01/05/20 LRV042 WD-03 B Floor Plan, prepared by Carma Building Group 17/06/20 LRV042 WD-06 B Elevations Sheet 1 of 2, prepared by Carma Building Group 17/06/20 LRV042 WD-07 B Elevations Sheet 2 of 2, prepared by Carma Building Group 17/06/20 LRV060 WD-02 A Site Plan, prepared by Carma Building Group 01/05/20 LRV060 WD-03 A Floor Plan, prepared by Carma Building Group 01/05/20 LRV060 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 01/05/20 LRV060 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 05/09/17 January 2021 – Villas 21,37 & 38 LRV021 WD-02 A Site Plan, prepared by Carma Building Group 09/11/20 LRV021 SD-03 A Floor Plan, prepared by Carma Building Group 09/11/20 LRV021 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 09/11/20 LRV021 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 09/11/20 LRV037 WD-02 A Site Plan, prepared by Carma Building Group 09/11/20 LRV037 SD-03 A Floor Plan, prepared by Carma Building Group 09/11/20 LRV037 WD-06 A Elevations Sheet 1 of 2, prepared by Carma Building Group 09/11/20 LRV037 WD-07 A Elevations Sheet 2 of 2, prepared by Carma Building Group 09/11/20 Additional Condition – September 2017 A Flood Emergency Plan (FEP) must be provided to Council within 3 months of the date of this Decision Notice. The FEP must be displayed in a prominent location/s and available to all residents within the development. The FEP must include but not be limited to the following: a clear process for management and residents of actions during a flood event; a process to advise prospective purchasers of flood risks; warnings to be issued by management (timing and method); location/s of the FEP within the development; evacuation methods; and refuge areas during flood inundation (including maps). referral agencies Not Applicable advisory notes The following Advisory Notes are for information purposes only and do not form conditions of approval: Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes Not Applicable variation approval details Not Applicable further development permits required Development Permit for Building Works (All building works) submissions Not Applicable rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Glen Conforti Development Planner Enc: Appeal Rights Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice – 51989.108 – 19 June 1989 Decision Notice - Minor 51989.108.02 - 17 October 2007, with an amendment to condition 1 (Villas 46, 52 & 53) Decision Notice - Minor 51989.108.03 - 4 August 2014, with an amendment to condition 1 (Villas 36 & 47) Decision Notice - Minor 51989.108.04 - 27 October 2014, with an amendment to condition 1 (Villas 44, 45, 66 & 67) Decision Notice - Minor 51989.108.05 - 9 March 2015, with an amendment to condition 1 (Villas 8, 23 & 114) Decision Notice - Minor 51989.108.06 - 17 August 2015, with an amendment to condition 1 (Villas 46, 52 & 53) Decision Notice - Minor 51989.108.07 - 23 October 2015, with an amendment to condition 1 (Villas 34 & 59) Decision Notice - Minor 51989.108.08 - 10 June 2016, with an amendment to condition 1 (Villas 17, 25, 26 & 55) Decision Notice - Minor 51989.108.09 - 12 September 2016, with an amendment to condition 1 (Villas 16 & 56) Decision Notice - Minor 51989.108.10 - 3 February 2017, with an amendment to condition 1 (Villas 32, 42 & 61) Decision Notice - Minor 51989.108.11 - 10 July 2017, with an amendment to condition 1 (Villas 43, 48 &72) Decision Notice - Minor 51989.108.12 - 18 September 2017, with an amendment to condition 1(Villas 49, 73 & Revised Plans 72) and additional conditions 4. Generally in Accordance 51989.108.13 – 29 March 2018 Decision Notice - Minor 51989.108.14 – 9 May 2019, with an amendment to condition 1 (Villa29, 30 & 31) Decision Notice – Minor – 51989.108.15 – 24 June 2020, with an amendment to condition 1 (Villas 42, 43 & 60) Decision Notice – Minor – 51989.108.16 –20 January 2021 with amendment to condition 1 (Villas 21,37 & 38) Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 11 of 11 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 11 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Minor Change Existing Approval 51989.108.16Related documentApplication case desk ↗
About this file
- File size
- 330 KB (small file)
- File type
- DOCX
No other editions are linked here.