Original source · versioned page text
Jetty OP Works App - Planning Report
Attached to the e-mail Operational Works Application OPW21/0133 - DA Form 1 - Cover Letter - Planning Report - Plan - 10 and 12 Ravenwood Drive Noosa Heads.
1. Development Intent David and Penelope Gibson, and Ewen McPherson as Director of Woodburn Holdings Pty Ltd (the applicant) are seeking a development permit to their existing joint jetty located at 10 and 12 Ravenwood Drive, Noosa Heads 4567 QLD (subject site). The application constitutes an application for Operational Works Permit and is in response to Noosa Council’s Advisory Letter received 5th November 2020. This Operational Works Permit application encompasses the following elements: • Addition of a jet ski dry storage pontoon and • Reconfiguration of the approved joint jetty. The existing jet ski dry storage device is currently fitted to the western side of the joint jetty. It is proposed that this will be located to the internal side of the jetty on the east. No further works to the canal/sea floor are required. It is intended that the jetty will be ordinarily utilised to: • Moor two (2) jet skis, and • Moor two (2) vessels. This report should be read in conjunction with the accompanying covering letter, DA Form and Jetty Plan (enclosed in Appendix 1). RG Strategic Town Planning Report – OPW Application 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.