Log in to see the plans as drawn GENERAL:
G.1. CONSTRUCTION METHODS ARE THE RESPONSIBILITY OF THE BUILDER. DETAILS SHOWN ARE A
GUIDE AND ALTERNATE DETAILS MAY BE SUBMITTED FOR ENGINEERING APPROVAL, PRIOR TO
WORKS COMMENCING
G.2. PROPRIETARY ITEMS ARE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS
SPECIFICATION AND DESIGN DETAILS.
G.3. IT IS THE RESPONSIBILITY OF THE BUILDER TO MAKE GOOD ANY DAMAGE CAUSED TO
ADJOINING STRUCTURES OR ELEMENTS CREATED DURING CONSTRUCTION.
SITE PREPARATION AND FOUNDATIONS:
P.1. EARTHWORKS SHALL BE IN ACCORDANCE WITH AS 3798 INCLUDING THE FOLLOWING.
50 P.2. THE BUILDING SITE SHALL BE STRIPPED OF ALL VEGETABLE MATTER AND THE ASSOCIATED
CUT MESH CUT MESH
EITHER EITHER
SIDE SIDE OF JOINT
OF JOINT 50 CONTRACTOR
CONTRACTOR TO TO
PROVIDE A A
PROVIDE CUT MESH EITHER SIDE OF JOINT PROVIDE 10mm COMPRESSIBLE FILLER WITH
LAYER OF TOPSOIL.
PROVIDEPROVIDE 1-N12 LONGITUDINAL
1-N12 LONGITUDINAL BAR BAR SAW
SAW CUTCUT JOINT.
JOINT. REFER
REFER TYPICAL
TYPICAL PROVIDE 1-N12 LONGITUDINAL BAR TEAR-OFF STRIP AND FILL WITH PARCHEM EMER-SEAL
WHERE P.3. THE SUBGRADE (UNDER SLABS) SHALL BE COMPACTED TO A DENSITY OF NOT LESS THAN 97%
WHERE MESHMESH NOTAT
NOT CUT CUT AT CROSS
CROSS BAR BAR SAW
SAW CUTCUT JOINT
JOINT TREATMENT.
DETAIL. WHERE MESH NOT CUT AT CROSS BAR CONSTRUCTION SEALANT HM FC OR APPROVED EQUIVALENT
OF THE MAXIMUM DRY DENSITY AS DETERMINED IN ACCORDANCE WITH METHOD 5.1.1 OF AS
1289 (STANDARD COMPACTION).
P.4. A MOISTURE BARRIER OF TWO LAYERS OF 0.2mm POLYETHYLENE FILM LAPPED 200mm AND
EQ
EQ
TAPED AT JOINTS SHALL BE PROVIDED UNDER THE SLAB.
P.5. SITE EARTHWORKS AND PREPARATIONS SHALL BE COMPLETED IN ACCORDANCE WITH SECTION
EQ
EQ
5 OF THE VINCENT GEOTECHNICAL REPORT.
CONCRETE:
C.1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS2870 AND AS3600.
C.2. CONCRETE SHALL HAVE THE FOLLOWING PROPERTIES SEE TABLE BELOW:
R20 SHRINK WRAPPED ROUND DOWEL R24 ROUND BARS 450mm DOWEL SLEEVE CONCRETE TABLE
LONG @ 300 CTS
600 LONG AT 400 MAX. CTS. EXP. CLASS & GRADE CLEAR COVER TO MAX AGG. MAX SLUMP
ELEMENT (CONCRETE) REINF'T (mm) SIZE (mm) (mm)
CLASS
SAW JOINT DETAIL - SJ DOWELLED EXPANSION JOINT DETAIL - EJ CONCRETE SLABS B2 N32 50 20 80
SCALE 1:10
SCALE 1:10 C.3. CURING OF ALL CONCRETE MUST BE ACHIEVED BY KEEPING SURFACES CONTINUOUSLY WET FOR A PERIOD OF 7
DAYS U.N.O. IN ACCORDANCE WITH AS 3600. APPROVED SPRAY-ON CURING COMPOUNDS THAT COMPLY WITH AS
3799 MAY BE USED WHERE FLOOR FINISHES WILL NOT BE AFFECTED. WET HESSIAN MAY BE USED TO RETAIN
CONCRETE MOISTURE WHERE PROTECTED FROM THE WIND AND TRAFFIC. CURING MUST COMMENCE IMMEDIATELY
AFTER CONCRETE PLACEMENT.
REINFORCEMENT:
R.1. SYMBOLS ON DRAWINGS FOR GRADE AND TYPE OF REINFORCEMENT ARE AS FOLLOWS:
R: DENOTES STRUCTURAL GRADE 250 PLAIN ROUND BAR TO AS4671
6mm N: DENOTES HOT ROLLED GRADE 500 DEFORMED BAR DUCTILITY CLASS N TO AS4671
SL: DENOTES HARD DRAWN WIRE GRADE 500 SQUARE REINFORCING MESH DUCTILITY CLASS L TO AS4671
PARCHEM EMER-SEAL CONSTRUCTION Ø6 CLOSED CELL EXPANDED RL: DENOTES HARD DRAWN WIRE GRADE 500 RECTANGULAR REINFORCING MESH DUCTILITY CLASS L TO AS4671
SEALANT INSTALLED IN ACCORDANCE POLYETHYLENE FOAM BACKING ROD R.2. ALL N BARS TO BE GRADE 500.
WITH MANUFACTURERS SPECIFICATION R.3. CLEAR COVER TO REINFORCEMENT SHALL BE PROVIDED BY APPROVED CHAIRS, SPACERS OR TIES AS REQUIRED TO
PROVIDE ADEQUATE SUPPORT AS FOLLOWS:
12mm
- BARS 16mm AND LESS AND FABRIC - 1000mm CENTRES
18mm
R.4. USE MESH SUPPLIED IN FLAT SHEETS UNLESS APPROVED OTHERWISE.
1/4 DEPTH
R.5. WELDING AND BENDING OF REINFORCEMENT IS NOT PERMITTED UNLESS SHOWN ON THE DRAWINGS OR
OF SLAB
APPROVED BY ENGINEER.
R.6. PROVIDE MINIMUM MESH LAPS TO CROSS WIRES OF REINFORCING MESH, SO THAT TWO OUTERMOST WIRES OF
3mm WIDE SAW CUT WITHIN 4-6 ONE SHEET OVERLAP TWO OUTERMOST WIRES OF ADJACENT SHEET BY AT LEAST 25mm, THUS:
HOURS OF PLACEMENT USING
'SOFF-CUT' SAW CUT SYSTEM
25
MIN. MINIMUM
LAP
TYPICAL SAW CUT DETAIL CONCRETE MAINTENANCE :
0 0.2 0.4 0.6m PM.1. UPKEEP AND REPLACEMENT OF SEALANTS IS PART OF THE ONGOING MAINTENANCE REQUIREMENTS FOR THIS SITE.
PM.2. CONCRETE SLABS WILL NOT BE MAINTENANCE FREE FOR THE DURATION OF THEIR DESIGN LIFE.
SCALE 1:10 (A1)
DESIGNED SCALE JOB CODE
PRELIMINARY - NOT FOR CONSTRUCTION SUNSHINE COAST OFFICE MAC VAN NAM CLIENT
BRIAN WILLIAMS
LEVEL 1, SHOP 1
CHECKED
MARK DAVIS PROJECT
NOOSA LAKELANDS ECO RESORT P004250
51-55 BULCOCK STREET PROJECT MANAGER
CAMERON BROMFIELD
CALOUNDRA, QLD 4551
ENGINEERING CERTIFICATION
LOCATION
LOT 2 - 396 LAKE COOROIBAH ROAD SHEET NUMBER REV
PH: (07) 3253 2222
4/12/2025
DATE
A
REV
ISSUED IN RESPONSE TO RFI DATED 17/10/2025
DESCRIPTION
FINN
REC
CB
APP PART OF THE WEB: www.premise.com.au SHEET TITLE
CONCRETE NOTES AND DETAILS
C350 A
REVISIONS mey GROUP CAMERON BROMFIELD RPEQ No:34164 ORIGINAL SHEET SIZE A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.