Original source · versioned page text
2021-11-09 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 NOVEMBER 2021
Condition 83
83. The development shall comply with the Noise Management Plan (Report No:
R19084/D3295/Rev.4/30.03.20) prepared by David Moore & Associates and dated 30 March
2020 to the reasonable satisfaction of Council, including:
a. The necessary and appropriate noise control measures incorporated into the façade
of the apartments and within the restaurant/café in the Resort Facilities Building.
These measures shall include:
i. Upgraded glazing and air-conditioning to the potentially affected apartments;
ii. Strategically placed wing walls on balconies to screen the apartment and
balconies from outdoor dining areas;
iii. Revised hours of operation to no later than midnight for the restaurant/café
(indoor area only);
iv. The outdoor dining areas associated with the restaurant/café use is to operate
between the hours of 6am and 10pm only;
v. After 10pm, all patrons must be within the building confines with doors/windows
closed, except for the ingress and egress of patrons and staff;
vi. The underside of all roof elements over outdoor dining areas associated with the
café use are to be lined with acoustic absorptive lining minimum NRC 0.7;
vii. Outdoor dining is confined to the 185m2 roofed area shown on the approved
plans.
viii. All amplified noise at the premises must be conducted through a sound limiting
device at all times to ensure that noise does not exceed the following: during the
daytime and evening (0600 to 2200) must not exceed 92 dB(A) LWA, which is
equivalent to 75 dB(A) + 5 = 80 dB(A) LAeq, adj, T at 3 metres from the speakers.
ix. Any live performer must be required to play through the in-house system. No
speakers (in addition to the in-house system) are permitted on site.
b. Within 20 business days of the commencement of trading of the restaurant/café use,
Council must be provided with a Noise Management Plan which is specific to the use
and prepared on the basis of physical and technical assessment of noise from the
restaurant/café use, including both internal and external use areas. The noise
management plan must suitably detail physical and management noise control
measures.
c. The applicant must advise prospective purchasers that a Noise Management Plan
has been prepared to manage noise emissions related to the development.
d. The Noise Management Plan referred to in Condition 83(b) shall be incorporated in
perpetuity in the By-Laws of the Body Corp for the whole development.
e. The Noise Management Plan shall include a process for dealing with complaints and
specify that the Restaurant/Café Management and Body Corp Manager be
responsible for dealing with any noise complaints.
Applicant’s Request
The applicant has provided an updated Noise Management Plan to support changes to the
operation of the restaurant. Primarily, this relates to using the previously identified outdoor area
until midnight as it can now be enclosed. The applicant states:
The updated Noise Assessment Report and Noise Management Plan demonstrates that the minor
changes to enclose the dining area comply with the necessary regulatory standards. The enclosure
caters for sealed airlock openings.
Specifically, the applicant has requested:
We request minor amendments to condition 83 including:
Page 31 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.