Skip to the record
Beware of cheap imitations.

Council archive · source document

08/1166 - Preliminary Building Works assessable against the Planning [As Published] · 172008.1166

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

   

 

97 JUN 2008
ening ~ Tewantin
r

‘ont Ceunter

  

 

[Rature of the works

1, Nafure of work that requires assessment against a planning scheme:

Building work - Complete Table A (2 Operationat work - Complete Table B

Table A
i) What is the nature of the building work made assessable in the planning scheme?

Loxbinmx Q-ka Fenellorm Carcae on Slab _]

J
(ii) Ree any current approvals associated with this application? (e.g. material change of use)
No C1 Yes - Provide details below

of approval reference

 

     
 

 

 

 

[ 4.

Table B

(i) What is the nature of the operational work made assessable in the planning scheme?

 

 

 

L) Roadworks CD Stormwater (C Water infrastructure [J Clearing vegetation under the planning scheme
(J Drainage works + 1] Earthworks CO Sewerage infrastructure
LD Landscaping (Signage (Other - Specify

 

   
   

iii) What type of approval is being sought? (NOTE: if you have indicated muttiple
would be different for different operational work, it may be more

LO Development Permit. (1 Preliminary Approval

operational works in question (i) above and your answers to this question
appropriate to provide these details in an attachment to this form)

LJ Both (Specity below)

|

(iv) Is the operational work necessary to facilitate the creation of new lots (Le. subdivision)?
LJ No CD Yes - Specify the number of lots being created

 

 

 

 

(v) Are there any current approvals associated with this application? (e.g. Development Penmit or Preliminary

OONo Yes — Complete Table Ba)
Table B(a) sna oe Usk Oh bigyal’
1.

‘Approval for MCU or reconfiguring a lot)

 

  

iat

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. What is the dollar value of this operational work? (ie. the (ota! value including GST, materials and labour) $) 4 6 3 b
| Mantiatory Bae Be Bee a a ea = =
3. Confirm the following mandatory information accompanies this application

 

 

 

 

 

 

OFFICE USE ONLY
sats: arr

 

 

 

 

 

 

 

 

 

Advice for completing Part E
General advice
. Part A must also be completed for alt IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
I A development permit authorises development to occur, while a preliminary approval is a Step in the approval process and does not authorise development to occur.

 

Qi

 

 

 

 

Page 1

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1166 - Preliminary Building Works assessable against the Planning [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.