08/1166 - Preliminary Building Works assessable against the Planning [As Published] · 172008.1166
INTEGRATED PLANNING ACT 1997
SECTION 1 . Section 4 mu:
IDAS Assessment Checklist, Version 21.3, 8 May 2008
HERITAGE
ist be completed for all applications that require completion of the IDAS Assessment Checklist.
141A Isfry part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992?
No-Gotoar.18 ([C} Yes
if yes, has an exemption certificate for the proposal.’ been issued under the Queensland Heritage Act 1992?
Yes CINo
Ino, is the proposed work emergency work for the Queensland Heritage Act 1992?
Yes INo
Ino, is the work being carried out by the State?
o Yes No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protaction Agency (EPA),
it EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, lable 5, item 2; IP Reguiston, schedule 2, table 1. hem 11, table 2. tem 18: PA, section 1.3.5 (Delintions lor terms used in development)
1.18
Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(deyelopment that is exempt from assessment against a planning scheme), that is intended to be carried out ona place entered in a
Lg¢al Heritage Register under Part 11 of the Queensiand Heritage Act 1992?
No - Goto 01.2 oO Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local govamment against the IDAS Code in
the Queensland Heritage Regulation 2003. if the development involves building work and the local govemment is not the
Assessment Manager for the application, the local govemment has jurisdiction as Concurrence Agency.
IPA. schedule 8. part 7. tabla 5, item 2A, schedule 9, iables 1. 2, 3, 4 & 5: JP Reguiation, schedute 2, iable 1, item 11A: IPA, secton 1.9.5 (Detinilions for terms used in developinent}:
Queensiand Herkage Roguiation 2003, schedule 2 (DAS Code).
REMOVING QUARRY MATERIAL; WILD RIVER AREA __
12
ENVI
JPA, scheduls 8, part 1, labie &, item 1; IP Regulation, schedule 2, table 2. item 11: 1P Regulation. schedule 1, table 5. fem 2 {wid nor area}; Water Act 2000,
2005, section 434.
Dgés the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 ((] Yes
if yes, is an allocation notice required under the Water Act 2000?
No 0 Yes
Ifyes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
No - (Completa Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and Water (NRW). ff NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must ratuse to receive it.
(Complete Form 1, Part K7). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required fo
1 the purposes of the Wild Rivers Act 2005.
Section S66C; Wid Rivers Act
ee
RONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA _
1.3
DgBs the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gowats (J Yes
Ityes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
CNo
if no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each
proposed ERA?
Oo No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. If the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to 01.4
(1 Yes - Gow 01.4
D Yes
Ifyes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
Yes
Ifyes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
Oo Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. if the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
No - An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
oO No - Answer the following question/s on the next page
1 inthis
IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1166 - Preliminary Building Works assessable against the Planning [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.