Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Enclosure 1-Plans

Attached to the e-mail Operational Works Application OPW17/0016.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

| ~5m |

 

4.6 |

 

   

OYSTER REEF - XSECTION

 

  

OYSTER REEF FOOTPRINT ~11m42

   

©

  

Nominal LAT

 

FLOOD FLOW DIRECTION
OYSTER REEF - PLAN

LOCALITY PLAN

 

 

 

 

Oyster Shell Fill, see note 3.

   
 
  

Crest Bags, see note 8

     
 
 
   
   
    

Two Base Bags, see note 8 RRR o BOS YQ
QQ ROQQ ROS
CESSES
SKK
ROY
OO

 
    
 
           

Sandy or Sandy/Muddy

Maximum angle towards reef unit, see note 8

REEF UNIT - XSECTION

| im |

| Wooden stake / manila rope

 

0.6m

 

RRO
SOHN
SSKREREMK RS,
SSS

x PRX

SEQ So

SKE
SSO
eeectetetctctelctetetene
SSS OKROOO KS

SORES

QOS
SSS
CRS ORNS

QRS

 

 

 

 

 

approx D00rnth

abprox. 200m!

REEF UNIT - PLAN

NOTES

1. Measurements are in meters.

2. The reef general layout will be placed in a 5m equilateral
triangle.

3, Oyster shells are:
= To be whole (not fragments)
= Not to be sourced from within any Fish Habitat Area
-To be boiled for at least 10 minutes in accordance with
biosecurity principles

4, Unfilled coir bags are:
=to be 0.3m in diameter
to be 1.3m in length with one end closed during
manufacturing
-to have an apeture of approx. 20mm
to be Geotabries Australia CoirLog or engineer approved
equivalent

5. Coir bags are to be filled with the oyster shell mix to 1m
length of the bag

- Remaining 0.3m length of bag to be used to tie end
closed

- Oyster fil is to be well packed using a tube sleeve

~ Bag end closed using approx 0.3m of manila rope to form
a single Miller’s (bag) knot, followed by a single overhand
knot

- Two coir bags at base of reef unit to be in direct contact
with minimal space betwen

6. Wooden stakes
to be 0.6m length hardwood with 25x25mm thickness
to be suitable for marine environments
-to have 10mm diamter hole drilled approx 30mm from top
of stake

7. Manila rope

-to be 8mm diameter Emmett's Ropes Three-Strand
Hawser Laid Manila or engineer approved equivalent

length for anchorage to be approx. 2m

to be tied to wooden stakes such that approx. 1.3m length
of manila rope remains between stakes

-to be attached to wooden stakes by threading rope
through drill hole, followed by a double stopper knot. The
remaining manila rope end is to be hitched back onto the
wooden stake

8. Anchorage to be manila rope tied between two hardwood
stakes, see note 6 and 7

- stake/rope anchors to be placed approx. 0.2m from ends
of reef unit

- wooden stakes to be driven vertically or angled up to 20°
toward reef unit. Wooden stakes NOT to be angled away
from reef units

- manila rope to be pulled tight across coir bags such that
crest bag is NOT able to roll

- Reels to be relocated where hard substrate is
encountered

 

VERTICAL DATUM: AHD. [HORIZONTAL DATUM: MGA

 

REVISION REGISTER

 

 

 

 

 

 

 

DESCRIPTION

Revno, DATE BY ENG. APP.

 

International
ez Coastal
Management

OFFICE 50/G Arm, SYC Marina, Main Beach, 4217, QLD, Australia

 

FAX +617 55329147
WEBSITE www.coastalmanagement.com au

 

 

 

 

 

 

 

 

 

 

 

PROJECT NAME
NOOSA RIVER OYSTER REEFS
DRAWING TITLE
REEF DETAIL
DRAWING No Raven
2016.0028 - 020 A
[DRAWN : SK [CHECKED : BC JAPPROVED: AJ
oe sitll feo

RPEQ 2876

 

 

 

 

 

Ze: AB IscaLe DATE: 12 Sep, 2016|

 
Log in to download the original file

Enclosure 1-Plans.pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.