Original source · versioned page text
Delegated Report - Code - Planning MCU23 0058 [As Published]
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Local Plan Area Cooroy
Overlays Biodiversity, Waterways & Wetlands
Flood Hazard
Heritage & Character Area
Assessment Type Impact
1. PROPOSAL
This application seeks approval to redevelop and expand the existing Gymnastics club and the
Cooroy Sportsgrounds Clubhouse. The works are proposed to be undertaken in four (4) stages
with Stage 1 & Stage 2 involving extensions to the existing gymnasium building, including a new
training area, and Stage 3 & Stage 4 involving upgrades to the existing field lighting, and upgrades
to the shared clubhouse.
A detailed description of works in the proposed stages are provided in the following sections. The
site plan, locality plan, and staging plan are provided below.
Subject Site
Figure 1 – Locality Map
Figure 2 – Site Map
Page 2 of 28
Document Set ID: 22731989
Version: 4, Version Date: 29/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.