Skip to the record
Every meeting, every word.

Original source · versioned page text

Delegated Report - Code - Planning MCU23 0058 [As Published]

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                  Figure 6 – West Elevation




                                                  Figure 7 – North Elevation




                                                  Figure 8 – South Elevation
               Stage 3 – Lighting Upgrades to the Cricket Oval
               Stage 3 works involves upgrading the field lighting to the cricket oval. The proposed work includes
               the removal of the existing redundant poles and replacing them with new tapered octagonal poles
               and new lighting.




                                           Figure 9 – Proposed oval lighting plan

                                                                                                    Page 5 of 28

Document Set ID: 22731989
Version: 4, Version Date: 29/01/2024
Log in to download the original file

Delegated Report - Code - Planning MCU23 0058 [As Published].pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.