Original source · versioned page text
2015-08-18 Planning and Organisation Committee Agenda
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 18 AUGUST 2015
Page 15 of 139
lO oO
rr / o
g w TE CONSTRUCTION TOSE IN ACCORDANCE WITH THE AUSTRALIAN ™
ww DOMESTIC BUILDING CODE. So
- o Areas 2 ALL TMBER FRAMING TOBE N ACCORDANCE WTHAS 16842.210
wn” @® 3. PINE FRAMING TO BE MINIUMUM STRESS GRADE MGP 11MGP12 Lo
> — Name ‘Area ‘4 HARDWOOD FRAMING TO BE MINIMUM STRESS GRADE F14 § MINIMUM -
Upper foor aime JOINT GROUP 22
O co leurs sant 5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP 204, ®
2| 8 ‘SF SS Ws aoe
_ 7440 6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF. oD)
a WM ‘ceining room ie SPECIFICATIONS ALL OTHER FIXINGS TO E IN ACCORDANCE WITH
© | 2 aa is er comunalernemne *
- as <caamermmmes == | nai ce ne es or
: MANUFACTURERS SPECIFICATIONS.
S i z= VS | eae
— Git dlevaton 11.ALL TRADES ARE TO CONFORM WITH THE CURRENT AUSTRALIAN
—————————— : a (pay 8
co = / (rote—mest} g STANDARDS RELATING TO HIS OR HER OWN WORK
Qa. ———— e+" 12. TERMITE PROTECTION TO BE PROVIDED AS PER AS 3660.12000
S$ 8 FEATURE TMEER SAT TENDED PERGOLAS TO © Heer eee .
< oS | fenveet aaa” SII office Fr YO |
? (camped) Meee
S 2 ~ ps He ote _
pO ITT Goa | g
ai <3 _— existing (BESSY training room| i ; 5
2) Sih: oie | 7 Ae ||.
e | OVER THIS DECKING AREA ONLY | 1 Ff 2
O &, 2 L ee | N | (ee cq a
Z g hom ANNI Za a i
a Zr Ps i——_—Y 4 3
3 9 2 ‘pame removed 1 AP w z
ir ¢ . 3 Ae AAT esters tone / i | 33
wl jj | iO aa Ht
2 s i | tobe removed H So
& 1K H reception H yl fs] a $ g
LW 2 c (= ae Bes) H = —_—_— office g 2 s&s
E q|neimofg C1 oe | ote |
siocale 4 =
S 1 I * (| a a ee | CQ 3 =
: SI | pe 4
i | H . = y WIFE TFG TRIFG _ 2 3S
= a ee 2ererer el eee 4 GAL MESH FRED TO TEER
oO = DECKING VERTICAL GARDEN aS TO g g
Oo ~ ASUALLY ENHANCE FACADE TO CARPARK ~
z aire 7 ‘dp | | & 140x140 TIMBER POSTS dp ¥ ra
Oo é So
2 Ge) Sa. Saas. <) 2
a Ld mol] mest) maw fn 3 s
> a a 0 [ee | c
a ESET ee =
© pws is FT 2
cc Dm
Oo .
ne concept drawings only oO
O not for construction 2
za oO
z= PROPOSED: CLIENT: BUILDER: MANDY'S DESIGN & DRAFTING SHEET: _8 of 10] DATE: ISSUE NO: o
S OFFICE LAYOUT DOWLING & NEYLAN | TBC PH: 0403 481 474 SCALE: 4:40 |JUNE 15 || =
a} NOTE. THESE DRAWINGS 10 BE READ IN CONJUNCTION NOTE BULDER TO CONFIRM STNG AND DIMENSIONS BEFORE CONSTRUCTION a
a _See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.