Original source · versioned page text
2015-08-18 Planning and Organisation Committee Agenda
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 18 AUGUST 2015
Figure 1 – Artists impression of the proposed signage.
2. SITE DETAILS
2.1. Site Description
The shop is at street level at the western end of the Tingirana complex adjacent the walkway
connecting Hastings Street to the beach. The signs are placed on the stairwell wall (part of
common property) and the shop front. Figure 2 below identifies the shop’s location.
Figure 2 – Tingirana highlighted in purple and the location of the shop within the complex is
circled.
Page 22 of 139
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.