Original source · versioned page text
2015-08-18 Planning and Organisation Committee Agenda
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 18 AUGUST 2015
5. Certification must be submitted to Council from a Licensed Surveyor which
certifies the building will not exceed the Reduced Levels shown on the approved
plan referenced in Condition 3, based on construction progress at the time of
completion of framing (i.e. top plates) to the roof level of the approved atrium.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect
compliance with condition.
Building Appearance
7. All air conditioning units or other mechanical equipment must be fully enclosed or
screened such that they are not visible from the street frontages nor adjoining
properties.
8. All deck and balcony areas above ground floor must not be enclosed by
permanent fixtures such as shutters, louvres, glass paneling or the like.
9. The approved lift shaft must be glazed and predominantly transparent, as
indicated on the approved plans.
10. External finishes to the approved lift shaft, including any metal cladding or
flashings, must have low reflectivity to avoid glare nuisance to neighbouring
premises.
Landscaping
11. Existing trees on the site and within road reserves must be retained, except
where required to be removed to accommodate the approved dwelling.
12. Trees to be retained must be protected from clearing or construction activities by:
12.1.1. clearly marking vegetation to be retained with flagging tape
12.1.2. installing protective fencing around the drip line of the vegetation
12.1.3. restricting stockpiling, storage and vehicle parking to those areas
which are already cleared
12.1.4. using low impact construction techniques around vegetation.
13. The development site must be landscaped prior to the commencement of use.
All open space areas disturbed by the construction and/or within the site’s rear
setback must be planted with dense native screening vegetation of suitable
coastal shrub and tree species up to a mature height of 5m.
14. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques that allow for healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow
to full form.
WASTE
Refuse Management
15. Where the development involves the removal, relocation or demolition of a
building, a Waste Management Plan (construction and demolition) shall be
submitted and approved by Council prior to issue of a development permit for
Page 28 of 139
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.