PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 18 AUGUST 2015
18. Submission of written certification from a suitably qualified person confirming that
the noise levels from all mechanical equipment comply when measured at either
the residential boundary or outside the most exposed part of an affected building,
whichever is the closest to the equipment. The assessment and certification is
required immediately after installation of the equipment and prior to any
occupation of the building, and in a format approved by Council. All equipment
should be operating at the same time to test the overall noise level created.
Advice: It is highly recommended that the person you engage to certify the
installation is involved at the plan development stage so they can recommend
where this equipment is best located. They can also advise about noise
enclosures and can make other suggestions to avoid noise problems. It is a lot
more costly to try and deal with noise problems after everything is built.
19. Noise from residential building works shall comply with the following –
19.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
19.2. All reasonable measures are taken to minimise noise emissions.
19.3. Not permitted on Sunday or public holidays.
ENGINEERING
Geotechnical Stability
20. A Geotechnical Engineer or similar qualified person must assess the soil
condition on site, determine the soil classification, establish whether any
measures are required to protect the stability of adjoining buildings and/or
structures and/or land, and make recommendations on the type of foundation
system(s) best suited for the proposed development. The recommendations of
this report must be incorporated into the design and construction of the proposed
development.
21. Earthworks required on site must be carried out in accordance with Council’s
Planning Scheme Policy PSP5 – Engineering Design Standards so as not to
cause the additional ponding of water on any adjoining lands or the blockage of,
or interference with, any natural watercourses.
22. A Condition Survey must be carried out on adjoining buildings, structures and
services prior to any demolition, excavation or construction works taking place on
site. If distress already exists, a photographic survey should be undertaken, the
distress measured and a plan to monitor changes to distress must be
implemented. Copies of these surveys must be submitted to Council for its
records
23. The use of vibratory equipment of any kind is not permitted to be used (including
vibrating rollers and the use of vibrating installation techniques for sheet piling
and other construction vibrations caused by excavating, earthmoving or
demolition machinery or other similar construction techniques) unless approved
and supervised by a Certified Geotechnical Engineer. Under such
circumstances the operator of such equipment must at all times comply with the
directions of the Geotechnical Engineer.
24. The excavation of the site and the construction of the proposed works must not
have any adverse effects on the stability of adjoining buildings and/or structures
and/or services and/or lands. In this respect, a Registered Professional Engineer
Queensland must supervise the excavation of the site and the construction of the
new works to determine whether any additional measures are required to protect
the stability of adjoining buildings and/or structures and/or services and/or lands.
Page 30 of 139
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.