CONTEXT PLAN MATERIALS & FINISHES SCHEDULE
CODE / ITEM MANUF. REQUIREMENTS
T1 - Turf Type 1 25mm thick A-grade 'Winter Green' Couch. Refer to Detail 06, CD-300
EG-1 - Edge Type 1 100 x 38mm treated pine garden edging surround with 500 x 38 x 38mm treated pine pegs at
nom. 1200mm centres. Refer to Detail 07, CD-300
EG-2 - Edge Type 2 Nom. 85° spade edge. Refer to Detail 08, CD-300
FEN-1 - Fence Type Treated pine acoustic fence, height to meet acoustic report requirements as indicated on plan.
1 Lapped and capped (free of gaps) with treated pine sleeper along bottom edge. Minimum
surface density of 10kg/m² eg. Lapped 19mm thick treated pine timber palings. Post type,
footing and embedment for 2,500mm high fence to be designed by Structural Engineer. Refer
to Detail 9, CD-301
Point #
9000
COORDINATE TABLE
Easting Northing Elevation
502836.862 7081730.325 4.566
Description
SCREW IN CONC
GB1 - Garden Bed 300mm depth amended site or imported topsoil to specification. Cover with 100mm thick
CD-100
9001 502884.140 7081728.914 3.769 SCREW IN KERB
9002 502788.724 7081721.497 4.723 SCREW IN KERB
Type 1
9003 502901.520 7081827.155 2.336 SCREW IN KERB
organic forest mulch. Mulch to be coarse with a combination of bark, twigs and chips and
9004 502851.826 7081806.167 3.125 STAR PICKET PLACED
9005 502765.928 7081830.173 2.323 ORIG SCREW IN CONC
9006 502812.122 7081839.515 2.416 SCREW IN CONC
9007 502881.189 7081720.185 4.044 ORIG PSM
9008 502891.069 7081827.946 2.106 ORIG SCREW IN CONC
101 ExT
RP867318
509172005
2.312
STN.U -TEMP
maximum 10% fines. Refer to Detail 05, CD-300
ExW
ExS D ExS
9005
T2.487
Ex
509171095
PLM 0.25 2 10
509171104
2.263
HY
DSB - Revegetation 200mm deep, amended site topsoil and 100mm deep forest mulch. Mulch to be coarse with a
Type 2 to Drainage combination of bark, twigs and chips with maximum 10% fines. Install 700gsm Coir Netting laid
9003
SWD
SWD
Swale Batters over mulch. Lay across slope and pin at twice recommended rate to prevent the mesh from
SWD
509171039
lifting.
2.447
SWO -90MM
S150
SWD
Mulch Only to Areas around street trees to be 100mm thick forest mulch. Mulch to be coarse with a
47
S
Ex RP867318
46
Street Trees combination of bark, twigs and chips and maximum 10% fines.
RP867318
ExD
P1 - Paving Type 1 Light Wash Exposed Coloured Concrete. Colour to be Holcim Geostone 'Corfu Exposed' or
SWD
EMT W
ExS
RP867318 EMT X approved equivalent.
ExT
RP867318
ExW
EMT R
RP867318 EMT Y S150 509171031
P2 - Paving Type 2 Broom Finished Coloured Concrete. Colour to be Concrete Colour Solutions 'Jazz' or approved
RP867318 509172002 3.217
equiavalent.
4.317 HY
STN.U -TEMP
18
18
44
RP8673
RP8673
RP867318
Ex
43
RP867318 P3 - Paving Type 3 Pedestrian strength plain grey cement concrete with broom finish. Refer to Civil Engineer
S
documentation.
EMT S
EMT T
All Concrete Holcim (Australia) All broom finish concrete pavements to use Holcim 'ECOPactZero' carbon neutral concrete,
ExD
20
4.000
NOOMK
509172001
4.627
STN.U -TEMP
Pavements Pty Ltd verified by a product specific EPD. Refer to pavement types for colours and finishes.
ExS
509171003
3.116
ExT
OPSM 107889
SCOUR509171023
3.896
509171022
WSC
3.926
HY
9000
509171245
4.555
SWO -90MM
STOP509171025 9001
3.873
WSV
9002
GYMPIE STREET
ExT
ExE ExW 9007
ExT
ExE ExW
ExT
PLANTING SCHEDULE
STREET
BUTLER
DRAWING SCHEDULE D
25430 CD-000 COVER SHEET
25430 CD-001 SPECIFICATION NOTES
25430 CD-100 LANDSCAPE PLAN
25430 CD-300 CONSTRUCTION DETAILS
25430 CD-301 CONSTRUCTION DETAILS
D
D
CONSTRUCTION HOLD POINTS
Landscape Contractor is responsible for notifying Landscape Architect and arranging for progress inspections D
of the landscape at the following hold points. Failure to do so will result in Project Urban being unable to certify
completed works and may result in reworking to be undertaken at the contractor's expense.
Hold Point 1 - Pre-Start Meeting
Hold Point 2 - Preparation of subgrade, tree holes & drainage
Hold Point 3 - Review of placement and shaping of topsoil
Hold Point 4 - Review of advance tree stock - on site or in nursery prior to planting
Hold Point 5 - Initial setout of containerised plant stock
Where irrigation is specified the following hold points are required
Hold Point 6 - Set out of irrigation dripline prior to mulching garden beds
CERTIFICATIONS & RECEIPTS
Landscape Contractor is responsible for providing certifications as required in the specification notes and to
provide receipts to confirm delivery of specified materials. Typically, this will include the following.
· Site Soil Test Report and amelioration recommendations
· Receipts for soil conditioners and ameliorants
· AS4419 Certification for imported topsoil
· AS2303 Certification for advanced tree stock
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
C
17.11.2025
20.01.2026
04.03.2026
For Approval
For Approval
For Approval
LS
LS
LS
CS
CS
CS
CD-000 scale: 1:1000@A1; 1:2000@A3 D 22.04.2026 For Approval LS CS
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN
NORTH
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 sections
Section 2
14. Services
LANDSCAPE NOTES 10. Containerised Plant Material - Supply and Installation The location of all underground or overhead services shown on these drawings are indicative only. They have been incorporated
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with the scheduled at the design or Council Approval stage for general information. The Landscape Contractor shall be responsible for liaising with
nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a healthy root system and not the Principal Contractor to determine where the 'As Constructed' location of all water, sewer, stormwater, electrical,
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 25430 Cover Sheet CD-000. pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants are to be fully sun or communication or other existing services before commencing any excavation works.
Contractor to ensure they have the latest issue of the documents prior to tendering and construction. Contractor should also shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed
take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering and Electrical Engineering works plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not accept below Standard stock 15. Inspection Plan & Shop Drawing Review
which will be made available on site. Hard surface layout is to be at the discretion of the Project Manager. Where there is from the Nursery/Supplier. The Contractor shall co-ordinate the following inspections with the site superintendent:
conflicting information, contact the Landscape Architect. Landscape works for this contract are to include the following: - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the event of confirmation.
1. Co-ordination with Other Trades and Conduit Installation supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a Nursery inspection - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
2. Removal of Debris including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock (or good selection of stock) is - Pre-planting inspection - at commencement of placement of advanced plant material.
3. Sediment and Erosion Control present during the inspection. It is also recommended that the Landscape Architect is on site to inspect plant stock and plant set out prior to - Setout inspection - at first setout of containerised plant stock.
4. Excavation and Drainage of Planting Areas planting. - "On Maintenance" - at practical completion.
5. Topsoil - Supply and Incorporation - "Off Maintenance" - 365 days after practical completion.
6. Soil Amendments Plant stock notes:
7. Edging to Planting Areas - where not already supplied - Container sizes are noted as follows:- Contractor to provide shop drawings and structural design certification for review and approval of any custom designed
8. Shaping of Garden Areas - Pots in millimetres. structures, furniture or fencing.
9. Fences - Bags in litres.
10. Containerised Plant Material - Supply and Installation - Stock may be rejected if plants are:- 16. As Constructed Requirements
11. Street Tree Planting Location Notes -- Undersized proportional to specified container size or if the root system is underdeveloped. The Landscape Contractor is to clearly mark up and provide the Landscape Architect any changes to the built landscape from the
12. Garden Mulch - Supply and Spread -- Oversized proportional to specified container size or severely root bound. issued construction drawings. As Constructed information is to include dimensions, materials and depths which vary from and/or
13. Turf - Supply and Lay -- Unbalanced or uncharacteristic of normal or specified growth pattern for the species. are not included on the construction issue plans. Contributed Landscape Assets are to be captured and included in the ADAC
14. Services -- Not suitably acclimatised for the specific environment. survey for the development as per the Sunshine Coast Council As Constructed Data Standards and Guidelines. The Landscape
15. Inspection Plan & Shop Drawing Review -- Diseased, infested with pests or suffering from other form of significant stress. Contractor is to coordinate asset capture with the Project Surveyor and allow for hold points accordingly, especially with
16. As Constructed Requirements -- Have poor root development or root defects. underground services. Landscape contractor is to provide the following documentation as relevant:
17. Maintenance of Landscape Works (12 months) - Substitution of specified plant species only by written instruction from Landscape Architect. - Certification that all street trees comply with AS2303:2018.
18. Landscape Carbon Emissions - Contractor to provide MDS or Product Data Sheet of any proprietary furniture or structural items.
Implementation notes: - Certification of supplied topsoil to AS4419
1. Co-ordination with Other Trades Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of this project. - For amended site topsoil provide delivery dockets of ameliorant to confirm quantities supplied.
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Contractor all The following minimum is expected:
must comply with soil and erosion control measures. Contractor shall allow for the installation of electrical services for - Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of the hole to a 17. Maintenance of Landscape Works
landscape lighting at the appropriate time in the construction program. Contractor shall pay due consideration to installation of further depth of 100mm and loosen the sides of the hole. The Maintenance Period commences at the date of Practical Completion of Works. During the Establishment Period maintain best
irrigation lines so as to minimise disturbance to planted areas. The coordination of appropriate conduit lines forms part of this - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central horticultural practices including (but not limited to) the following items where required: watering, weeding, fertilising, pest and
contract. Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the contractors - Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is the works under normal use.
expense. Any disputes will be settled by the site Superintendent. ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as per the
manufactures specification. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing failed or
2. Removal of Debris - Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be inclusive of a twelve (12)
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout construction of as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. month maintenance program.
landscape works. Planting areas are to contain planting and selected drainage materials only and are not to contain any - Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that
building material waste. topsoil is not placed over the top of the rootball. Maintenance and Inspection Program:
Responsibility Weeks after practical completion Maintenance Inspection Frequency
3. Sediment and Erosion Control All advanced trees 25L or greater are to be certified as AS2303 compliant. Contractor to sight and supply certification to superintendent Contractor 0-2 3 per week
Where directed by the Principal Contractor all must comply with soil and erosion control measures. Refer Civil Engineers prior to accepting trees from the nursery. Contractor is to review all tree stock at unloading and prior to planting to ensure the compliance with Contractor 3-4 2 per week
drawings for all sediment and erosion control measures. the below. Trees that fail these criteria should not be planted and are to be returned to nursery Contractor 5 - 13 1 per week
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor Contractor 14 - onwards As per established maintenance regime
4. Excavation and Drainage of Planting Areas to tease out roots and prune as required to encourage healthy root development.
- Trees are to be self supporting, of good form and health with single undamaged leader, no bifurcations or bark inclusions. Maintenance Program General Notes
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve required planting
- Ensure trunk is not buried below flare in trunk at top of roots, contractor to scrape off excess potting mix as required. - Maintenance inspection frequencies are minimum.
depths. Excavate site soil as required to ensure consistent high quality planting material. Break up existing subgrade to a depth
- Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
of 300mm. Any excavated planting areas are to be scarified at sides to provide anchorage for future root development.
Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. Do not vary the plant levels are critical during early establishment. Avoid over irrigating planting areas.
Additional excavation works will be required in areas of advanced plant material. Drainage is to be incorporated to all planting
locations from those specified on the drawings unless otherwise directed by the Superintendent. Should it be necessary to vary the locations and - Mow turf every 2 weeks.
areas that are enclosed by hard edging and not otherwise drained. Contractor should allow for drainage to all garden areas.
spacing for any reason, immediately apply for directions by the Superintendent. Replace failed or damaged plants. This does not include - Prune and shape all shrubs and trees on a monthly basis as required.
vandalised or stolen plant material - this will be replaced prior to practical completion. Trees are to be planted 20-30mm above finish level to - Remove all stakes at 90 day inspection, or after satisfactory establishment.
5. Topsoil - Supply and Incorporation
allow for settling. - Fertilise all garden beds and street trees at 3 monthly intervals.
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil)
- Contractor shall maintain an up to date written log book to record inspection observations and actions.
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. Site topsoil
11. Street Tree Planting Location Notes. - The log will be made available to the site superintendent, upon request, at any time for examination.
shall be screened to break up clumps, remove unwanted material and ensure soil is easy to work. Screening to take place within Locate road verge street trees in accordance with Local Authority Requirements or as indicated below:
2 weeks of requiring soil for use. Top soils are to be tested for horticultural suitability and receive appropriate amelioration if - Minimum 2.0 metres from driveway cross over. 18. Landscape Carbon Emissions
required. All topsoil must be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. - A minimum of 1.0 metre from all services to prevent root/service conflict and to provide future ease of maintenance requirements. Reduction of greenhouse gasses created during the construction or maintenance of the landscape works and embodied
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent any ponding. - A minimum of 2.0 metres from stormwater pit. greenhouse gasses in materials is strongly encouraged. Contractors are to provide a written statement outlining carbon reduction
Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no greater than 2m high x 3m - A minimum of 4.0 metres from street lights. measures adopted by their business which are applicable to this project. These could include items such as the following:
wide. Topsoil storage piles for storage greater than 4 months should be seeded with a suitable grass mix and screened prior to - A minimum of 750mm behind the kerb or centrally if between footpath and back of kerb.. · Use of electric powered equipment for construction and maintenance
use. Eradicate weeds using environmentally acceptable methods. Project Urban discourages the use of Glyphosate and is happy · Use of electric or hybrid vehicles or fleet for transportation and construction
to discuss alternative options with the Landscape Contractor. Noxious weeds need to be screened out of the topsoil prior to 12. Garden Mulch - Supply and Spread · Purchase of power from sustainable sources or production of own power through Solar PV cells
placement. All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be level with · Use of organic fertilisers rather than petrochemical products
the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed clear of plant stems to · Use of low carbon concrete or materials fabricated through low carbon supply chains
6. Soil Amendments avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and bark) with no more than 10% fines · Use of local materials with low transport carbon costs.
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by soils test: nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as described above. Mulch is to be formed to avoid · Offsetting greenhouse gas emissions through accredited offset schemes
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds. Work into placement against green plant stems and overflow from purpose formed edges, kerbs and pathways. Samples of all mulch types to be provided
the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting New Trees: 1 - to Landscape Architect for approval prior to installation. Project Urban is in the process of reviewing products that we specify to favour the use of low embodied greenhouse gas
2 cups per tree in the hole. emissions materials. Contractors should review materials schedules and ensure their pricing reflects the specified materials.
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium Media - 15 13. Turf - Supply and Lay Substitutions of materials should consider the embodied greenhouse gas in those materials. We are happy to consider alternative
grams per litre Obtain turf from a specialist grower of cultivated turf. lower carbon footprint products suggested by the contractor.
Turf notes:
7. Edging to Planting Areas- where not already supplied - "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should finish flush - Turf to be laid within 24 hours of being cut and on day of delivery.
with adjoining finished levels and hard pavements. Round / Ease all edges where applicable. - Grade turf areas evenly with falls to drains.
- Allow for ground preparation and placement of 100mm topsoil to specification requirements.
8. Shaping of Garden Areas - Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications).
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show planting to best - Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. adjacent finished surfaces.
- Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at
9. Fences the end of the maintenance period.
All fences and footings to be located within private property where applicable. Fencing to common boundaries are to be - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or
located on the boundary line as determined by a registered surveyor. Refer to Fencing notes and specification. Where new undulations with coarse washed sand.
fences are indicated on the drawings, existing fences are to be demolished, unless otherwise noted. - Keep lawn moist until established and rooted in. Install temporary barriers (flagging tape) to ensure walking and driving on turf areas is
prevented and avoided.
- Replace failed turf and relay with new turf.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES NOT FOR CONSTRUCTION
A
B
17.11.2025
04.03.2026
For Approval
For Approval
LS
LS
CS
CS
CD-001 scale: N/A
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS
Section 3
Notes: Notes: Notes: Notes:
- Thoroughly water the root ball - Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firm base. - Place the rootball on a firm base.
immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting.
Tree guard only required - Number of stakes will vary with pot size. Refer plant schedule. - Cultivate sides of excavated hole 50mm deep. - Cultivate sides of excavated hole 50mm deep.
when specified in Materials - Cultivate sides of excavated hole 50mm. - Do not disturb kerb, road pavement or road side drainage works. - Do not disturb kerb, road pavement or road side drainage works.
& Finishes Schedule - Tease out roots on side of rootball when planting. - Tease out roots on side of rootball when planting.
Marker stake: - Ensure top of rootball is not buried; expose and set flush with finished level. - Ensure top of rootball is not buried; expose and set flush with finished level.
Hardwood Stake Size:
12 x 12 x 75mm 140mm = 25 x 25 x 90mm
Form an earthen basin Hardwood Stake Size:
200mm = 25 x 25 x 90mm Hardwood Stake Size:
around the base of the plant. 45ltr = 2 x (38 x 38 x 1800mm)
25ltr = 38 x 38 x 1800mm 45ltr = 2 x (38 x 38 x 1800mm)
75ltr = 2 x (50 x 50 x 1800mm) Set soil level at top
Mulch: Pull away from 250 75ltr = 2 x (50 x 50 x 1800mm)
100ltr = 2 x (50 x 50 x 1800mm) of rootball (at flare
base of plant. Hardwood Stake: 25 x 25 x 100ltr = 2 x (50 x 50 x 1800mm)
200ltr = 2 x (50 x 50 x 2400mm) of trunk)
90mm. Place 600mm into 200ltr = 2 x (50 x 50 x 2400mm)
25
the ground. Do not place Hardwood stake: Place 600mm
through rootball. Secure with into the ground. Do not place 50 x 50 x 2400mm HW Timber Pull away mulch
Fertiliser: Do not allow through rootball. Secure with stake - Place 600mm into the from base of plant
ties by looping in a figure
contact with roots. ties by looping in a figure eight ground. Do not place through
eight pattern.
pattern. rootball. Secure with hessian ties by Form mulch berm
Topsoil blend Mulch - pull away looping in a figure eight pattern. to the perimeter of
from base of plant. Raise plant 50mm above the rootball
finished surface level.
Water retention additive
Form an earthen basin Raise plant 20-30mm above
Mulch: Pull away from Distance to local
around base of plant. top of kerb.
base of plant. authority requirments
Form an earthen basin Do not excavate
01 TUBESTOCK PLANTING Topsoil blend
around base of plant. within 50mm of
edge restraint or 100
CD-300 1:10@A1, 1:20@A3
Fertiliser: Do not allow pavement.
Top of Kerb
contact with roots. FSL
Water retention additive Topsoil blend
min 300
50
300
Water retention additive
2
1 Topsoil blend 1 1
Fertiliser: Do not allow
fertiliser to come in 1 1
02 140-300mm PLANTING contact with roots. Bio-degradable
CD-300 1:10@A1, 1:20@A3
width (w) Water retention additive geo-fabric
10 - 20mm Drainage gravel
2xw
100mm drainage gravel in
heavy or poor draining soils.
Connect drainage
gravel to back of kerb,
03 45-200ltr PLANTING Incorporate slow release organic subsoil drainage where
applicable
CD-300 1:10@A1, 1:20@A3 fertilizer and water retention
additives to backfill per
Manufacturer's recommendations
04 STREET TREE PLANTING
CD-300 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site
FSL
Mulch
- to 100mm depth Notes: F.S.L.
(X)
- All timber to be CCA pressure treated to
AS1604, Hazard 5, rough sawn pine.
Soil blend or site topsoil - All timber edges to be arissed to comply with Timber edge
- to 300mm depth council standards.
- All timber ends to have one coat of Cuprinol Stakes
or equal prior to installation.
Cultivated subgrade - Stakes to be 400mm into ground at max. Existing/compacted
- to 150mm depth 1200mm centres, or as required to obtain /subgrade/subase
smooth curves. Top of stake to finish 20mm
Notes: below top of timber edge. Where timber edges
-Refer Materials & Finishes meet at corners provide double stakes.
Schedule for fertiliser - All fixings to be hot dipped galv.
application requirements - Leading edge is to be free of burrs and
splinters.
05 GARDEN BED PROFILE Mulch - refer to Specification.
CD-300 1:10@A1, 1:20@A3 Cut angle to be nom. 85°
Cut depth to be nom. 100mm
Turf - refer to
Turf as specified TIMBER EDGE STAKES (X) = Height above Specification.
38 50 finished surface level FIXINGS
Topsoil - refer to
50mm Bugle Headed Specification.
FLUSH
Topsoil Batten Screws.
°
85
100
- to 100mm depth 20mm 75mm Bugle Headed
100
Batten Screws.
Cultivate subgrade 100mm
100mm Bugle Headed
- to 150mm depth 150mm Batten screws.
100x38mm
Existing subgrade
50x50mm
06 TURF PROFILE 07 EDGE TYPE 1 08 EDGE TYPE 2
CD-300 1:5@A1, 1:10@A3 CD-300 1:5@A1, 1:10@A3 CD-300 1:10@A1, 1:20@A3
Timber garden edge Spade cut garden edge
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
17.11.2025
04.03.2026
For Approval
For Approval
LS
LS
CS
CS
CD-300 scale as noted
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS
Section 4
LEGEND
FEN-1 FEN-1 LANDSCAPE PLAN
ExS
S150 S150 S150 S150 S150 S150 S150 S150 S150
T1 - Turf Type 1
T1
509171245
4.555
SWO -90M
M
50917200
2.312
STN.U -TEM
4000mm Ø mulch ring EG-1 EG-1 - Edge Type 1
9002
5
1 XAN chr Refer to detail
P
(100mm depth)
S150
T1
around existing trees. EG-2 - Edge Type 2
50917200
4.317
STN.U -TEM
EG-2 Refer to detail
2
Tr1 1
P
E
600m²
FEN-1 FEN-1 - Fence Type 1
Refer to detail
1 XAN chr 6
S150
1038m² GB1 - General Planting Type 1
GB1 Deep Planting
P3
DSB - Drainage Swale Batter
DSB Planting
ExS
T1
E Mulch Only
S150
FEN-1
Driveways to be installed to
Noosa Council standards.
Minimise root disturbance P1 - Paving Type 1
P3
EMT
in consultation with arborist P1 Light Wash Exposed
Coloured Concrete
ExT
P2 - Paving Type 2
Tr2
S150
2 4 5 P2 Broom Finished
EG-1 EG-1 Coloured Concrete
600m² 711m² 824m² 30 DIA BRE
ExS
Electrical conduit P3 - Paving Type 3
E
T1 installation through root 43 P3 Broom Finished
Existing large street trees zones to be completed as T16321 Plain Concrete
P1 GROUNDCOVERS/SHRUBS
to be retained. Arborist per arborist report and 10 WES GB
D
to advise on driveway under arborist supervision.
S150
ExE
location
ExT and construction
ExE
ExT
GRASSES
ExT
methodology to preserve 42
Where driveways are finished 30 DIA BRE
tree integrity. RP867323 7 30 LOM SHA
above existing levels - taper 5897m² 1080m² HEDGES
turf down to sides at max.
ExS
1:4 with sandy loam soil.
P3 10 LOM KB TREES
D
Location and EXISTING TREE TO BE RETAINED
3 10 CAL RR AND PROTECTED
construction of driveways
ExT
T1 600m² 30 LOM SHA
E
to avoid damage to 19 DIA BRE
existing street trees as EXISTING TREE TO BE REMOVED
much as is practicable Tr3
ExS
24 DIA BRE
509172001
5 HAR MH
4.627
STN.U -TEM
5 LOM KB
7 WES AB 19 LOM SHA 7 LOM KB 5 WES AB 18 DIA BRE P2
P
5 LOM KB 5 LOM KB EG-1
D
5 WES AB 10 HAR MH
19 LOM SHA EG-1 19 DIA BRE 5 HAR MH
E 10 LOM KB
EG-1
E E E E
30 DIA BRE
ExT
W100 W100 W100 W100 W100 W100 W100 P2
9000
P1
1 TRI LUS P1 1 MEL mal
15 DIA BRE 5 LOM KB T1 BASIN LOT P1
P2 10 HIB GS P2 10 WES GB
16 HAR MH 1 TRI LUS SWD
SWD SWD SWD SWD SWD SWD SWD SWD SWD SWD
190m²
SWD
20 LOM SHA EG-1
SWD
1 TRI LUS 1 MEL mal SWD
SWD
SWD
EG-2
ExS
SWD
DSB
SWD
30 DIA BRE 30 LOM SHA 30 DIA BRE 30 LOM SHA 38 DIA BRE FEN-1 FEN-1 19 LOM SHA
D
GYMPIE STREET
5 TRI LUS
SWD
30 LOM SHA
ExT
10 LOM KB
SWD
34 DIA BRE
SWD
P2
ExS
P2 10 CAL RR
SWD
D
1 TRI LUS
SWD
FEN-1
30 DIA BRE
EG-2
DSB
ExT
SWD
48 39 40 41
SWD
10 LOM KB
RP867323 RP867323 RP867323 RP867323
ExS
1 TRI LUS
D
SWD
FEN-1
10 WES GB
SWD
30 LOM SHA
P1
ExT
SWD
FEN-1
1 TRI LUS
SWD
D
ExS
SWD
10 LOM KB
5 LOM KB
P2
W100
ExD
ExT
ExS ExS ExS ExS ExS ExS ExS ExS ExS ExS ExS ExS
1 TRI LUS 12 CAL RR
Ex
D
ExW ExW 5 WES AB 36 DIA BRE
1 MEL mal
SCOUR50917
ExW ExW ExW ExW ExW ExW
ExW
STOP50917
50917
3.926
ExW
HY
509171031
ExW
3.217
50917110
HY
509171095
3.896
2.263
2.487
HY
ExT
WSC
PLM 0.25
ExT ExT ExT ExT ExT ExT ExT ExT ExT ExT ExT 20 HIB GS ExT
3.873
1022
WSV
1023
4
1025
28 LOM SHA
2 10
BUTLER STREET P3
9007
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN NOT FOR CONSTRUCTION
A
B
C
17.11.2025
20.01.2026
04.03.2026
For Approval
For Approval
For Section 5
Approval
LS
LS
LS
CS
CS
CS
CD-100 scale: 1:200@A1; 1:400@A3 D 22.04.2026 For Approval LS CS
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN NORTH
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS
Section 6
Paling - refer to notes
Post - refer to notes
CAR PARK SIDE
Rail - refer to notes
ROAD SIDE
Fence Type 2 Notes:
1. Palings to be ACQ pressure treated pine 100 X 25mm to AS1604
Hazard 3. Fix palings with 2 (No.) 50mm x 2.5mm screw shank or
100
ring shank HDG nails to each rail.
50
G.L.
eq.
2. Paling locations are to be fixed to rails and sleepers as above.
Footings - Round top of Overlap of palings to be 30mm. Bottom of palings to overlap
footings to shed water. sleeper by 50mm.
- Refer to Engineer's drawings. 3. Posts to be ACQ treated HWD to AS1604, Hazard 5, refer
1800
Specification. All post to have no heart (50mm from centre of pith).
Aris all edges. All posts to be 100 x 100mm, evenly spaced with a
maximum spacing of 2400mm.
Corner posts and end posts to have footings to a depth of
eq.
1200mm.
4. Rails to be ACQ treated Pine to AS 1604, Hazard 3 100 x 50mm
Capping - 100x25mm as per spec. Butt join rails as shown on alternative posts where
possible. Screw rails to posts with 1(No.) Type 17 100mm Bugle
Post
100
Head Batten Screws. Aris all edges.
25
G.L.
5. Capping to be ACQ pressure treated pine to AS1604, Hazard 3
100
Rail
100 x 25mm. Screw capping to rail with 1(No.) Type 17 Bugle Head
Paling Batten Screws @ 600 cts. Arris all edges.
6. Fittings are to be hot dipped galvanised for all screws and
fittings. Coat with a film of grease or a bitumestic product before
1000
use.
7. All surfaces to be painted along internal & top facing surfaces.
10mm dia. Gravel Prior to installation paint specified in Materials and Finishes
nom.100
Schedule.
ROAD SIDE
350dia.
max.2400 centres Paling
Rail
Capping rail over
09 FENCE TYPE 1 Post
CD-301 1:20@A1, 1:40@A3 CAR PARK SIDE
1.8m high timber paling fence
Butt join rails as shown
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
17.11.2025
04.03.2026
For Approval
For Approval
LS
LS
CS
CS
CD-301 scale as noted
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS