25430_Opw [D]
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Notes: Notes: Notes: Notes:
- Thoroughly water the root ball - Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firm base. - Place the rootball on a firm base.
immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting.
Tree guard only required - Number of stakes will vary with pot size. Refer plant schedule. - Cultivate sides of excavated hole 50mm deep. - Cultivate sides of excavated hole 50mm deep.
when specified in Materials - Cultivate sides of excavated hole 50mm. - Do not disturb kerb, road pavement or road side drainage works. - Do not disturb kerb, road pavement or road side drainage works.
& Finishes Schedule - Tease out roots on side of rootball when planting. - Tease out roots on side of rootball when planting.
Marker stake: - Ensure top of rootball is not buried; expose and set flush with finished level. - Ensure top of rootball is not buried; expose and set flush with finished level.
Hardwood Stake Size:
12 x 12 x 75mm 140mm = 25 x 25 x 90mm
Form an earthen basin Hardwood Stake Size:
200mm = 25 x 25 x 90mm Hardwood Stake Size:
around the base of the plant. 45ltr = 2 x (38 x 38 x 1800mm)
25ltr = 38 x 38 x 1800mm 45ltr = 2 x (38 x 38 x 1800mm)
75ltr = 2 x (50 x 50 x 1800mm) Set soil level at top
Mulch: Pull away from 250 75ltr = 2 x (50 x 50 x 1800mm)
100ltr = 2 x (50 x 50 x 1800mm) of rootball (at flare
base of plant. Hardwood Stake: 25 x 25 x 100ltr = 2 x (50 x 50 x 1800mm)
200ltr = 2 x (50 x 50 x 2400mm) of trunk)
90mm. Place 600mm into 200ltr = 2 x (50 x 50 x 2400mm)
25
the ground. Do not place Hardwood stake: Place 600mm
through rootball. Secure with into the ground. Do not place 50 x 50 x 2400mm HW Timber Pull away mulch
Fertiliser: Do not allow through rootball. Secure with stake - Place 600mm into the from base of plant
ties by looping in a figure
contact with roots. ties by looping in a figure eight ground. Do not place through
eight pattern.
pattern. rootball. Secure with hessian ties by Form mulch berm
Topsoil blend Mulch - pull away looping in a figure eight pattern. to the perimeter of
from base of plant. Raise plant 50mm above the rootball
finished surface level.
Water retention additive
Form an earthen basin Raise plant 20-30mm above
Mulch: Pull away from Distance to local
around base of plant. top of kerb.
base of plant. authority requirments
Form an earthen basin Do not excavate
01 TUBESTOCK PLANTING Topsoil blend
around base of plant. within 50mm of
edge restraint or 100
CD-300 1:10@A1, 1:20@A3
Fertiliser: Do not allow pavement.
Top of Kerb
contact with roots. FSL
Water retention additive Topsoil blend
min 300
50
300
Water retention additive
2
1 Topsoil blend 1 1
Fertiliser: Do not allow
fertiliser to come in 1 1
02 140-300mm PLANTING contact with roots. Bio-degradable
CD-300 1:10@A1, 1:20@A3
width (w) Water retention additive geo-fabric
10 - 20mm Drainage gravel
2xw
100mm drainage gravel in
heavy or poor draining soils.
Connect drainage
gravel to back of kerb,
03 45-200ltr PLANTING Incorporate slow release organic subsoil drainage where
applicable
CD-300 1:10@A1, 1:20@A3 fertilizer and water retention
additives to backfill per
Manufacturer's recommendations
04 STREET TREE PLANTING
CD-300 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site
FSL
Mulch
- to 100mm depth Notes: F.S.L.
(X)
- All timber to be CCA pressure treated to
AS1604, Hazard 5, rough sawn pine.
Soil blend or site topsoil - All timber edges to be arissed to comply with Timber edge
- to 300mm depth council standards.
- All timber ends to have one coat of Cuprinol Stakes
or equal prior to installation.
Cultivated subgrade - Stakes to be 400mm into ground at max. Existing/compacted
- to 150mm depth 1200mm centres, or as required to obtain /subgrade/subase
smooth curves. Top of stake to finish 20mm
Notes: below top of timber edge. Where timber edges
-Refer Materials & Finishes meet at corners provide double stakes.
Schedule for fertiliser - All fixings to be hot dipped galv.
application requirements - Leading edge is to be free of burrs and
splinters.
05 GARDEN BED PROFILE Mulch - refer to Specification.
CD-300 1:10@A1, 1:20@A3 Cut angle to be nom. 85°
Cut depth to be nom. 100mm
Turf - refer to
Turf as specified TIMBER EDGE STAKES (X) = Height above Specification.
38 50 finished surface level FIXINGS
Topsoil - refer to
50mm Bugle Headed Specification.
FLUSH
Topsoil Batten Screws.
°
85
100
- to 100mm depth 20mm 75mm Bugle Headed
100
Batten Screws.
Cultivate subgrade 100mm
100mm Bugle Headed
- to 150mm depth 150mm Batten screws.
100x38mm
Existing subgrade
50x50mm
06 TURF PROFILE 07 EDGE TYPE 1 08 EDGE TYPE 2
CD-300 1:5@A1, 1:10@A3 CD-300 1:5@A1, 1:10@A3 CD-300 1:10@A1, 1:20@A3
Timber garden edge Spade cut garden edge
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
17.11.2025
04.03.2026
For Approval
For Approval
LS
LS
CS
CS
CD-300 scale as noted
RESIDENTIAL SUBDIVISION - 12 GYMPIE STREET, TEWANTIN
JOB NUMBER: 25430 CLIENT NAME: MAJP INVESTMENTS