A copy of the VMP (Council approved copy) is to be LEG END
provided to all involved project stakeholders.
TREES TO BE RETAINED
AND PROTECTED
A.2_ Roles and responsibilities
Superintendent
The Superintendent will fulfill the duties as described
within AS4000 and will be a RPEQ Civil Supervisor and will TREES POSSIBLE FOR RETENTION
project manage the civil contractor including clearing THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
works. DETAILED DESIGN
Superintendent's Representative (SR)
The superintendent's representative delegated to manage 7 \ TREES FOR REMOVAL
vegetation issues will be the Landscape Architect. The n ° REFER VEGETATION ASSESSMENT SCHEDULE
Landscape Architect will liaise and seek approval from the - * |
Council ecologist/ environmental officer regarding any < v
change to the tree retention strategies described on the ~
approved VMP. The SR will organise the project arborist SS WEED SPECIES
as required when any works are to occur under trees
illustrated on the VMP. No works are to occur until this
approval is received from Council.
REFER VEGETATION ASSESSMENT SCHEDULE
Contractor
The contractor is to follow the requirements of this VMP
as part of their WUC. Instructions are to be given by the y
Superintendent and his/her representative on the M4
responsibilities and restrictions placed on works with °
regards to the revegetation and rehabilitation of the site. TREE PROTECTION FENCE
The contractor is to advise the superintendent whenever
works are programmed around trees to ensure the
arborist can be present. FILL
Refer Civil Plans
DEAD TREES
REFER VEGETATION ASSESSMENT SCHEDULE
Pre-Start Meeting with Council
At the commencement of works, a pre-start meeting is to CUT |
be held between the Council, contractor, the Refer Civil Plans
Superintendent and the Superintendent's Representative.
This meeting is to inform the contractor of the intent of TPZ TREE PROTECTION ZONE
AS PER AS4970-2009
the VMP and to help locate areas or trees that have
specific requirements, and to set up a system of regular
inspections by the SR to ensure the VMP is being adhered
to. Any tree protection fencing (construction barriers)
required as per Note B2 should be installed at this time for
approval by the Council.
x
x
YY
WCE:
re
Qe
<td
ESE) B.1 Clearing Procedures:
(Grr e Prior to commencement of clearing operations, the site
CTP is to be inspected and locations of fauna and fauna
I habitat noted by a qualified wildlife officer (fauna
ad spotter) capable of assessing, treating and relocating
fauna.
=> All cleared vegetation, with the exception of fertile
1 weed material, is to be chipped and stockpiled for reuse
I on site or taken offsite for lawful disposal.
e Large hollow trees and logs are to be retained as
habitat for terrestrial species.
e Any detection of a Koala will require a mandatory
l
}. stopworks.
I
l
l
mall
-+--------------L---------
B.2 Clearing methodology
The nature of the supervised clearing operation will be
such that any Fauna will have the opportunity to retreat
into any protected or uncleared areas of the site or
adjacent the site. Clearing is to be staged in a way that
directs fauna to adjacent habitat areas beyond the clearing
ee / ! ¢ G FOR APPROVAL 2016-04-27 RC AG
works. Clearing shall begin at the furthest point from the F FOR APPROVAL 2016-04-22 RC AG
desired habitat vegetation and be cleared towards it. The E FOR APPROVAL 2016-04-22 RC AG
fauna spotter shall be present during these operations to D FOR APPROVAL 2016-02-15 RC AG
x KEY PLAN ensure safe travel for any fauna spotted in trees or in the c FOR APPROVAL 2016-02-04 RC AG
vicinity. B FOR APPROVAL 2015-11-12 RC AG
YK Scale 1:500 @ A1 A FOR APPROVAL 2015-11-11 RC AG
B.3 Storage And Stockpiling ISSUE: DETAILS: DATE: INIT: CHK'D:
e Stockpile areas are to be located, away from drainage
lines, native bushland, vegetation to be retained, or
tree protection areas.
e Protect all stockpiles from erosion and erect erosion SSS===
protection barriers to the perimeter of stockpiles - refer
to Civil Engineering drawings for sediment and erosion
control program, control measures, monitoring, and
maintenance procedures.
e Trees mulched for reuse on the site must be stockpiled att
NIN
and turned regularly for at least 3 months.
URBANCONSULTANTS
Fix barrier mesh
with at least two
wire ties to each
picket.
SINGLE TREE
Protective fence to be
installed. Refer Note 1. If
there is inadequate space
for this fence, refer to
300
PLAN VIEW
B.4_ Corrective actions and reporting reporting
oq : . . . . If a contractor is found to be clearing vegetation indicated
g Drawing B in this detail. Wrap trunk with low- - to be retained in the Vegetation Assessment Schedule
2 grade geotextile fabric. € (VAS) found in this VMP then penalties may apply, as
Ss E enforced through the Local By-Laws of Council. Where
S 3mm thickness E€ trees to be protected are damaged, replacement of
wire ties. Fix to — & damaged vegetation shall be solely at the contractor's PROJECT TITLE:
batten with 2 a expense. Costs will be determined using Australian
h d “ Standard DR 99307 : Amenity trees - Guide to valuation PRECI NCT E2
MULTIPLE TREES eavy duty unless approved.
ya HSE AT
—T battens. NOOSA SPRINGS, NOOSA HEADS
Star pickets Maximum con
at ° spacings 50mm. ,
maximum 3m 3 ALTUM
centres.
ee
—_t VEGETATION
PLAN VIEW PICKET DETAIL ELEVATION MANAGEMENT PLAN /
Tree Protection Using Mesh Protection of Individual Tree
A . 8 B To be used where space for mesh barrier is inadequate, COV E R S H E ET
Barrier and where excavators and similar are being used
nearby. COPYRIGHT © 2013 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED
(-_\ TREE PROTECTION DETAILS inrittafuurchatestrnaeana mhmontmmenr
KY Not to Scale PROJECT: PLAN: ISSUE: NORTH:
SCALE: 1:500 @ Al
DATE: 11/11/2015
FILE NAME: M2652_VMP_PLANS.DWG
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.