Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Revised DA Form 1

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

  

11) Dividing land into parts by agreement — how many patts are being created and what is the intended use of the
ee cyg
Intended use of parts created

   
 

    

       
 
 

    

Residential Commercial Industrial Other, please specify:

 

 

 

 

Number of parts created

 

 

12) Boundary realignment

 

42,1) What are the current and proposed areas for each lot co ising the premises?
Current lot Proposed lot

Lot on plan description Area (m?) Lot on plan description Area (m?)

 

 

 

 

 

 

 

 

 
 

12.2) What is the reason for the boundary realignment?

 
 
    

 

  

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)

Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

  
 

    

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

   
 

14.1) What is the nature of the operational work?

 

LJ Road work CJ Stormwater CO Water infrastructure

CJ Drainage work OO Earthworks (J Sewage infrastructure

encerina C1 Signage CJ Clearing vegetation
[\y’Other — please specify: [ Croagove { AyplczAion

   

 

  

14,2) Is the operational work necessary to facilitate the creation of new lots? fe.9. subdivision)
(1 Yes — specify number of new lots:

(No

14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)

S000 ~0 O
PART 4 —- ASSESSMENT MANAGER DETAILS

 
  

 

 
    
    

sEs}) Sete the assessment manager(s) who will be assessing this development application
|

SS
16) Has the local government agreed to apply a superseded planning scheme for this development application?

 

CJ Yes — a copy of the decision notice is attached to this development application
J Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached

[No

Page 5
DA Form 1 — Development Application details
Version 1 1— 92 .ILINF 2018
Log in to download the original file

Revised DA Form 1.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.