Skip to the record
Accept no imitations.

Original source · versioned page text

Stormwater Management Plan

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (11.7 MB): may take a few minutes to open.

Log in to see the plans as drawn
 

EMERGENCY OVERFLOW PIT
QUDM (2007) Section 7.05.04

‘Parameters:
Length side + (L1) = HIS (m)
Length side 2(L2) = 45 (m)
Depth of Water over inlet (h) = 01360) (m)

blockage factor G5)

Weir Flow Conditions;

 

Q, = 0.5 x 1.66 L.h®?

Where Qg = Flow into field inlet (m*/s)

1.66 = weir coefficient
L = weir length (m) [= 2 x {L1+L2}]

h = depth of water over inlet

Therefore y= GTS

 
Log in to download the original file

Stormwater Management Plan.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.