Log in to see the plans as drawn Main roofed areas from both buildings will drain to Rainwater
Harvesting Tanks with captured runoff utilized for landscape
irrigation. Tank overflow will be directed to catchment specific RIPs.
Final tank locations and sizes are to be confirmed utilising a water
balance model at OpWorks stage.
Runoff from main landscaped areas will be intercepted and treated via
landscaped swales prior to collection in pits and pipes and discharge to
RIPs.
Refer to Engineering Drawings at Appendix A for details.
4.2.1 Emergency Overflow (>100year ARI events)
Emergency overflow, for events (>Q100) which cannot be
wholly infiltrated by RIPs, is to be directed toward the
constructed wetland areas to the south as controlled sheet flow
at velocities/depths which will not induce significant scouring.
In order to achieve t
bunded Rapid Infiltration with stone pitched weirs 12m long
and at a constant height 0.2m below surrounding bunded areas
to control emergency overflow.
The rough nature of the stone pitching will also provide an
5.0
RIPs consist of a bottomless stormwater pit which promotes infiltration
through its base.
installed at the base of the RIP to protect against clogging of dune sands
below.
RIPs will be subject to routine inspection and maintenance by the
maintenance team and such maintenance is critical to their ongoing function.
(Refer Maintenance Schedule at Appendix B).
__________________________________________________________________________
A6769/22/SWMP/RevA October 2022 Page 5 of 6
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.