Stormwater Management Plan

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       Main roofed areas from both buildings will drain to Rainwater
       Harvesting Tanks with captured runoff utilized for landscape
       irrigation. Tank overflow will be directed to catchment specific RIPs.
       Final tank locations and sizes are to be confirmed utilising a water
       balance model at OpWorks stage.

       Runoff from main landscaped areas will be intercepted and treated via
       landscaped swales prior to collection in pits and pipes and discharge to
       RIPs.

       Refer to Engineering Drawings at Appendix A for details.


              4.2.1 Emergency Overflow (>100year ARI events)

              Emergency overflow, for events (>Q100) which cannot be
              wholly infiltrated by RIPs, is to be directed toward the
              constructed wetland areas to the south as controlled sheet flow
              at velocities/depths which will not induce significant scouring.

              In order to achieve t
              bunded Rapid Infiltration with stone pitched weirs 12m long
              and at a constant height 0.2m below surrounding bunded areas
              to control emergency overflow.

              The rough nature of the stone pitching will also provide an




5.0

RIPs consist of a bottomless stormwater pit which promotes infiltration
through its base.


installed at the base of the RIP to protect against clogging of dune sands
below.

RIPs will be subject to routine inspection and maintenance by the
maintenance team and such maintenance is critical to their ongoing function.
(Refer Maintenance Schedule at Appendix B).


__________________________________________________________________________

A6769/22/SWMP/RevA      October 2022                                         Page 5 of 6
SH/PL
                         Brah101 Pty Ltd t/as ALTA PROJECTS
Log in to download the original file

Stormwater Management Plan.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.